Laserfiche WebLink
C. Russell <br />CMLR <br />Page 2 <br />July 24, 1981 <br />2.04.7 <br />2.04.9 <br />HYDROLOGY <br />Western Engineers, Inc. has been contracted to complete a <br />hydrology study for the Dorchester #1 Kline. It is anticipated <br />that this study will answer the hydrologic questions of CMLR. <br />Although some data gathering may require several months, the <br />bulk of the hydrologic report should be completed by September. <br />SOIL RESOURCE INFORMATION <br />1. Deemed adequate by Ch1LR. <br />2.04.10 VEGETATIOhI <br />1. Reference area data surveys have been complted for spring <br />growth data. Another survey is planned for this fall. <br />2.04.11 FISH & WILDLIFE <br />1. Clarification of concern for riparian habitat, species of <br />fish, and beaver habitat will be provided both in this <br />section and updated vegetation information. No fish or <br />beaver are located on the lease area, as no surface water <br />capable of supporting these species exists. <br />2.04.12 PRIME FARMLAND <br />1. Carl Conner, Grand River Institute, has addressed the issue <br />of cultivation of land in the permit area, clarifying his report. <br />2.05 OPERATION & RECLAMATION PLANS <br />2.05.2 Estimated Area - Life of Mine <br />1. Clarification of five year permit areas is in process by <br />DCC staff. <br />2.05.3 Operation Plan - Permit Area <br />(1) Production Methods & Equipment <br />1-3. Currently being clarified by DCC staff. <br />(2) Operation Description <br />1. See 2.04.6(6) Subsidence <br />(3) Mine Facilities <br />1-7 In process by DCC staff <br />(4) Ponds, Impoundments & Diversions <br />