My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR10179
DRMS
>
Back File Migration
>
Application Correspondence
>
1000
>
APPCOR10179
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:26:35 PM
Creation date
11/19/2007 2:08:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984062
IBM Index Class Name
Application Correspondence
Doc Date
12/10/1982
Doc Name
STIPULATION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~. ~ . ~) <br />discharge occurred because a aedimentation_pond <br />has not yet been constructed at this discharge <br />point. See explanation in the immediately pre- <br />ceding paragraph. <br />XI. Discharge Point 11 (corresponds to CYCC Mine 3 Pond I) <br />A. Verification of construction of this pond has not yet <br />been submitted to the Division. See information set <br />forth in subparagraphs X.A, above, and XIX.F, below. <br />XII. Discharge Point 12 (corresponds to CYCC Mine 3 Pond B) <br />A. Verification of construction of this pond has not yet <br />been submitted to the Division. See information set <br />forth in subparagraphs X.A, above, and XIX.F, below. <br />XIII. Discharge Point 13 (corresponds to CYCC Mine 3 Pond C) <br />A. Verification of construction of this pond has not yet <br />been submitted to the Division. See information set <br />forth in subparagraphs X.A, above, and XIX.F, below. <br />XIV. Discharge Point 14 (corresponds to CYCC Mine 3 Pond E) <br />A. Verification of construction of this pond has not yet <br />been submitted to the Division. See information set <br />forth in subparagraphs X.A, above, and XIX.F, below. <br />B. TSS Monthly: <br />1. The averages of samples taken by CYCC at this site <br />for the months of March and May, 1981, and April, <br />1982, were in excess of the applicable limita- <br />tions. These discharges occurred because the pond <br />has not yet been constructed. See information set <br />forth in subparagraphs X.A, above. <br />C. Daily Iron: <br />1. The samples taken on 3/20/81, 3/26/81, 4/1/81, <br />4/8/81, and 4/1/82 showed total iron in excess of <br />applicable daily limitations. These discharges <br />occurred because the pond was not yet constructed. <br />See information set forth in subparagraph X.A, <br />above. In addition, total iron is a major compo- <br />nent of TSS. See information set forth in para- <br />graph VII.D, above. <br />-6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.