Laserfiche WebLink
<br />~. ~ . ~) <br />discharge occurred because a aedimentation_pond <br />has not yet been constructed at this discharge <br />point. See explanation in the immediately pre- <br />ceding paragraph. <br />XI. Discharge Point 11 (corresponds to CYCC Mine 3 Pond I) <br />A. Verification of construction of this pond has not yet <br />been submitted to the Division. See information set <br />forth in subparagraphs X.A, above, and XIX.F, below. <br />XII. Discharge Point 12 (corresponds to CYCC Mine 3 Pond B) <br />A. Verification of construction of this pond has not yet <br />been submitted to the Division. See information set <br />forth in subparagraphs X.A, above, and XIX.F, below. <br />XIII. Discharge Point 13 (corresponds to CYCC Mine 3 Pond C) <br />A. Verification of construction of this pond has not yet <br />been submitted to the Division. See information set <br />forth in subparagraphs X.A, above, and XIX.F, below. <br />XIV. Discharge Point 14 (corresponds to CYCC Mine 3 Pond E) <br />A. Verification of construction of this pond has not yet <br />been submitted to the Division. See information set <br />forth in subparagraphs X.A, above, and XIX.F, below. <br />B. TSS Monthly: <br />1. The averages of samples taken by CYCC at this site <br />for the months of March and May, 1981, and April, <br />1982, were in excess of the applicable limita- <br />tions. These discharges occurred because the pond <br />has not yet been constructed. See information set <br />forth in subparagraphs X.A, above. <br />C. Daily Iron: <br />1. The samples taken on 3/20/81, 3/26/81, 4/1/81, <br />4/8/81, and 4/1/82 showed total iron in excess of <br />applicable daily limitations. These discharges <br />occurred because the pond was not yet constructed. <br />See information set forth in subparagraph X.A, <br />above. In addition, total iron is a major compo- <br />nent of TSS. See information set forth in para- <br />graph VII.D, above. <br />-6- <br />