Laserfiche WebLink
~.a <br />• ~ • ~I <br />XV. <br />1. The samples taken on 4/15/82 and 4/26/82 showed <br />TSS in excess of daily limitations. These dis- <br />charges occurred because the pond at this site has <br />not yet been constructed. See information set <br />forth in subparagraphs X.A, above, and XIX.F, <br />below. <br />2. 3/9/82: Alleged violation is vacated (erroneously <br />cited). <br />A. Verification of construction of this pond has been sub- <br />mitted and accepted by the Division. <br />B. The samples taken on 2/3/81, 3/3/81, 5/19/81, 5/27/81, <br />and 4/19/82 showed TSS in excess of daily limitations. <br />These discharges occurred because the pond at this site <br />has not yet been constructed. See information set <br />forth in subparagraphs X.A, above, and XIX.F, below. <br />2. 3/9/82: Alleged violation is vacated (erroneously <br />cited). <br />C. TSS Monthly: <br />1. The monthly averages of samples taken at this dis- <br />charge point in March and May, 1981, and March, <br />1982 showed figures in excess of the applicable <br />monthly TSS limitations. These discharges oc- <br />curred because the pond was not constructed at the <br />time of the discharges. The pond has now been <br />constructed and verification of construction has <br />been accepted by the Division. <br />XVI. Discharge Point 16 (corresponds to CYCC Mine 2 Pond M) <br />Discharge Point 15 (corresponds to CYCC Mine 3 Pond F) <br />A. Verification of construction of this pond has not yet <br />been submitted because the pond has not been con- <br />structed. See information set forth in subparagraphs <br />X.A, above, and XIX.F, below. <br />B. TSS Daily: <br />A. Verification of construction of this pond has been sub- <br />mitted and accepted by the Division. <br />XVII. Discharge Point 17 (corresponds to CYCC Mine 2 Pond K) <br />-7- <br />