Laserfiche WebLink
Permit Vumber CO-0068, ( ) <br />Page 6 of 7 <br />7. The Regulatory Authority directs Bear Caal Company to submit, for review <br />. and approval by the Regulatory Authority, proposed locations and construction <br />specifications for the three monitoring stations to be installed upon the <br />backfilled material at the Bear Na. 2 portal area. Immediately fallowing the <br />completion of backfilling and grading of the Bear 40. 2 portal area, these <br />three monitoring stations shall be installed as specified and surveyed. Sur- <br />veying of these stations shall be repeated on a semi-annual basis for a period <br />of two years. Results of the surveying of these stations shall be submitted <br />to the Regulatory Authority within 30 days following completion of the semi- <br />annual survey. If monitoring of the backfilled area detects movement, which <br />the Regulatory Authority determines to represent an indication of imninern: <br />hazard, the Bear Coal Company shall expeditiously develop and implement, fol- <br />lowing the Regulatory Authority's approval, a plan to mitigate that hazard and <br />to stablize the backfilled areas. <br />8. The Regulatory Authority direc'.s Bear Coal Company to perfor-n Proctor <br />testing to determine the moisture-density relations of the materials to be <br />utilized in backfilling the Bear Na. I and No. 2 mine portal areas and submit <br />the rESUit to the Regulatory Authority. In conformance with the recommenda- <br />tions of Rocky 4auntain Geotechnical, Inc., the materials shall be placed and <br />compacted to achieve 95~ of the maximum proctor density, as determined in <br />accordance with AS174 standard TEST 0-648. Further, Bear Coal Camparry shall <br />submit a certified inspection report to verify completion of backfilling and <br />grading of the Bear No. 1 and No. 2 mine partai areas in conformance with the <br />aoproved plan. This mortified apart shall be prepared by a qualified regis- <br />• tered professional engineer or professional geologist. The report shall be <br />submitted to the Regulatory Authority within 60 days of the completion of <br />l backfilling and grading. <br />4. The Regulatory Authority directs Bear Coal Camparty to submit a detailed <br />engineering plan for the portal access road and portal facilities at the Bear <br />No. 3 Mtne, for review and approval by the Regulatory Authority, no later than <br />30 days fallowing approval of the permanent program permit. This detailed <br />engineering plan shall include road and portal cross-sections, road and portal <br />plan and grade design drawings, and detailed engineering design drawings for <br />all retaining structures and drainage facilities. No additional disturbance <br />shall occur in the area of the portal access road or portal facilities until <br />these detailed engineering plans have been reviewed and approved by the Regu- <br />latory Authority. <br />i0. The Regulatory Authority directs Bear Coal Company to submit the locations <br />and construction specifications for monitoring facilities designed to monitor <br />the stability of the portal access road and portal facilities at the Bear No. <br />3 !line. These monitoring facilities shall consist of appropriately located <br />tilt me*_ering and location monitoring facilities. inese facilities shall 'x <br />designed to monitor both the operational and reclaimed configurations of the <br />poral access road and portal facilities. Installation of these monitoring <br />facilities shall occur as immediately following constuction in the portal <br />access road and portal facility areas as is feasible. ~4anitoring shall rm- <br />mence irmediately following installation and continue on a semi-annual basis <br />. until ::+o years following completion of the reclamatien of the por al access <br />read and per•tal facility area. °.esults of t'le serli-annual monitoring shall to <br />SUCmi:~2d :,^, the 3e^_UlatO r•r .yUth Or'. .f 'Nl t.`iln .~ ddYS 'O1~CW1n0 C:,mp12Li0n Of <br />.het _zmi-annual noniT.cr're. If t';e ClCnltcr'ne .;f =!lese 'aci i :ties ce*_ects <br />an•, ',;ffiline^t natsr=, in t!le ~Drnion cf .::e =e?uiatcr•r ~.Ut'~Or'ty, Sear meal <br />...^cnv shd it eXCeCItiCL'S iy level .7 and '. CID I e!?ie!1L, fC11CWing ~e7UlctCr•_'/ <br />~UtilCr'LJ ,'.Dp r7Val, a D1.:^ .J mit'. 7at2 :h dt hazara and -0 SL 8b 11 :? the .iT-eC_- <br />~n :~nro <br />