Laserfiche WebLink
<br />-6- <br />Stipulation No. 16: <br />WITHIN 90 DAYS OF PERMIT ISSUANCE, THE PERAIITTEE WILL SUBMIT A <br />HAUL ROAD RECLAMATION PLAN TO THE DIVISION WHICH WILL ADDRESS <br />RECLAMATION OF THE PIT NO. 1 HAUL KOAD. THIS PLAN WILL, AT A <br />MINIMUM, ADDRESS APPLICABLE DESIGN CRITERIA OF 4.03 FOR THE ROAD <br />TO BE LEFT, PLANS FOR TOPSOILING AND SEEDING, AND A DE190NSTRATI0N <br />THAT THE MATERIAL LEFT IN THE ROAD BASE WILL NOT CAUSE R MATERIAL <br />SHORTAGE ELSE[dHERE IN THE PERMIT AREA. THIS PLAN AND RECLAMATION <br />ACTIVITIES SHALL BE IMPLEMENTED IMh1EDIATELY UPON APPROVAL BY THE <br />DIVISION. <br />Stipulation No. I7. <br />WITHIN 90 DAYS AFTER PERMIT ISSUANCE, TRINIDAD BASIN MINING SHALL <br />SUBMIT TO THE DIVISION A CERTIFICATION DOCUMENT WHICH STATES THAT <br />ALL NAUL ROADS WERE CONSTRUCTED OR RECONSTRUCTED IN ACCORDANCE WITN <br />THE PLAN CONTAINED IN THE APPROVED MLRD PERMIT APPLICATION. THE DOCU- <br />MENT SHALL BE CERTIFIED BY A QUALIFIED REGISTERED PROFESSIONAL <br />ENGINEER. THIS CERTIFICATION DOCUMENT IS ALSO REQUIRED TO BE <br />SUBMITTED AFTER CONSTRUCTION OF ANY NEW HAUL ROADS AT THE MINE. <br />Stipulation No. 18: <br />THE PERMITTEE IS REQUIRED TO IMMEDI.~ITELY INCORPORATE ALL PREVIOUSLY <br />APPROVED SUBMITTALS REGARDING THE TRINIDAD LOADOUT FACILITY INTO <br />THIS PERMIT DOCUMENT, AND IS BOUND TO FOLLOW THE OPERATION RND <br />RECLAMATION PLAN PREVIOUSLY APPRGVED BY THE DIVISION. <br />