My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR10030
DRMS
>
Back File Migration
>
Application Correspondence
>
1000
>
APPCOR10030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:26:27 PM
Creation date
11/19/2007 2:07:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981048
IBM Index Class Name
Application Correspondence
Doc Date
10/1/1982
Doc Name
TRINIDAD BASIN MINE MLR C-048-81
From
MLR
To
TRINIDAD BASIN MINING INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.e <br />-5- <br />Stipulation No. lI: <br />THE PERMITTEE SHALL SUBMIT TO THE DIVISION A BIENNIAL REVEGETATION <br />MONITORING PLAN FOR DIVISION REVIEW AND APPROVAL, WITHIN Z20 DAYS <br />OF PERI'42T ISSUANCE. UPON DIVISION APPROVAL, THE PLAN SHALL BE <br />INITIATED. <br />Stipulation No. I2: <br />IF, DURING THE VEGETATION SAMPLING, IT IS DETERMINED THAT THREATENED <br />OR ENDANGERED PLANT SPECIES INHABIT THE PERMIT AREA, THE PERMZTTEE <br />SHALL IMMEDIATELY NOTIFY THE DIVISION. THE DIVISION WILL THEN DETERMINE <br />WHAT MEASURES WILL BE REQUIRED TO INSURE THE CONTINUED EXISTENCE OF <br />THESE SPECIES. <br />Stipulation No. 13: <br />THE PERMITTEE SHALL PROVIDE THE DIVISION WITH DESIGNS FOR ADDITIONAL FUTURE <br />ELECTRIC POWER LINES AND OTHER TRANSMISSION FACILITIES TO BE CONSTRUCTED <br />ON THE PERMIT AREA, WITHIN 30 DAYS OF PERMIT ISSUANCE. THE PERMITTEE <br />WILL CONSTRUCT RLL FUTURE FACILITIES IN ACCORDANCE WITH REA DESIGNS <br />WHICH PREVENT RAPTOR ELECTROCUTION. <br />Stipulation No. 14: <br />THE DIVISION DIRECTS TRINIDAD BASIN MINING TO SUBMIT THE DATA AND <br />ANALYSIS OF OVERBURDEN SWELL AND MATERIAL BALANCES RELIED UPON BY <br />THE COMPANY TO PROJECT OVERBURDEN SWELL FACTORS FOR THE TRINIDAD <br />BRSZN MINE. THIS INFORMATION RND R REPORT OF THE ANALYSIS SHALL <br />BE SUBMITTED TO THE DIVISION FOR REVIEW WITHIN 30 DAYS FOLLOWING <br />APPROVAL OF THE PERPIIT. THIS INFORMATION SHALL INCLUDE DISCUSSION <br />OF PREVIOUS PIT VOLUMES, PRE- AND POST-MINING TOPOGRAPHY OF <br />PREVIOUSLY MINED AREAS, INCLUDING PROPOSED AND EXISTING ROAD <br />CONFIGURATIONS, AND OVERBURDEN STRATIGRAPHY AND S4JELL CHARACTERISTICS, <br />AT A MINIMUM. MINING SHALL NOT PROCEED BEYOND CUT NO. 13 OF PIT <br />NO. 4 PRIOR TO WRITTEN APPROVAL BY THE DIVISION OF THIS ANALYSIS. <br />Stipulation No. I5: <br />THE DIVISION DIRECTS TRINIDAD BASIN MINING COMPANY TO AMEND ITS <br />POST-MINING TOPOGRAPHIC MAPS AND APPROPRIATE PERMIT APPLICATION <br />NARRATIVES TO SPECIFICALLY DISCUSS ITS PLAN TO ACCOMMODATE THE <br />PROJECTED BRCKFILL MATERIAL BALANCE RESULTS PORTRAYED IN CORRECTED <br />TABLE V-1 OF THE AMENDED PERMIT APPL SCATION. <br />THESE APPLICATION AMENDMENTS SHALL 13E SUBMITTED TO SHE DIVISION <br />FOR REVIEW NO LATER THAN 60 DAYS FOLLOWING APPROVAL OF THE <br />PERMIT. MINING SHALL NOT PROCEED BfiYOND CUT NO. 13 OF PIT <br />NO. 4 PRIOR TO WRITTEN APPROVAL BY THE DIVISION OF THESE <br />AMENDMENTS. <br />
The URL can be used to link to this page
Your browser does not support the video tag.