Laserfiche WebLink
.• <br />-9- <br />Stipulation No. 5: <br />THE PERMITTEE WILL REVISE TABLE V-3 TO REFLECT TOPSOIL HANDLING <br />AND STORAGE OPERATIONS AS THEY OCCUR ON THE GROUND. THE TABLE <br />SHALL PROJECT TOPSOIL VOLUMES FROM EACH CUT FOR EACH PIT, AND WILL <br />INDICATE THE DISPOSITION OF EXCESS TOPSOIL TO SPECIFIC TOPSOIL <br />STOCKPILES. IF THERE IS A DEFICIT, THE TABLE SHALL IDENTIFY WHICH <br />STOCKPILE TOPSOIL MATERIAL WILL COME FROM AND VOLUME TO BE REMOVED. <br />THIS TABLE WILL BE SUBMITTED TO AND APPROVED BY THE DIVISION WITHIN <br />60 DAYS AFTER PERMIT ISSUANCE. <br />Stipulation No. 6: <br />WITHIN 60 DAYS OF PERMIT ISSUANCE, THE PERMITTEE SHALL SUBMIT AND <br />HAVE APPROVED BY THE DIVISION A PLAN ADDRESSING THE MULCHING AND <br />SEEDING OF TOPSOIL STOCKPILES, THE MULCHING PLAN SHALL INCLUDE, <br />AT A MINIMUM; TYPE OF MULCH, METHOD OF APPLICATION, AND RATE OF <br />APPLICATION. TXE SEED MIX SHALL INCLUDE, AT A MINIMUM; SPECIES <br />TO BE SEEDED, RATES OF SEEDING FOR EACH SPECIES IN POUNDS P.L.S./ <br />ACRE, METHOD OF SEEDING, AND TIh1E OF SEEDING. <br />Stipulation No. 7: <br />THE PERMITTEE WILL SUBMIT TO THE DIVISION FOR APPROVAL AND INITIATION <br />DURING THE NEXT GROWING SEASON A PLAN FOR THE SAMPLING OF VEGETATIVE <br />COMMUNITIES WITHIN THE PERhlZT AREA, AND ESTABLISHMENT OF REFERENCE <br />AREAS WITHIN THE PERMIT AREA. THIS PLAN SHALL EXPLICITLY DISCUSS SAMPLING <br />METHODOLOGIES FOR TXE COLLECTION AN1) ANALYSIS OF COVER, PRODUCTION, <br />WOODY PLANT DENSITY, AND SPECIES DIVERSITY DATA FOR EACH VEGETATIVE <br />COMh1UNITY TO BE DISTURBED WITH THE PERMIT AREA; ANALYSIS OF DATA FOR <br />DETERMINATION OF SAMPLE ADEQUACY; ANALYSIS OF DATA FOR COMPARABILITY <br />OF PRE-MINING RND REFERENCE AREAS; AND DATES OF SAMPLING. <br />Stipulation No. 8: <br />WITHIN 30 DRYS OF THE COMPLETION OF VEGETATION SAMPLING, THE PERMITTEE <br />SHALL SUBMIT THE RESULTS OF SUCH SAMPLING TO THE DIVISION FOR REVIEW <br />AND APPROVAL. <br />Stipulation No. 9: <br />THE PERMITTEE SHALL SUBMIT A PERMANENT RECLAMATION MIX TO THE <br />DIVISION FOR APPROVAL NO LATER THAN 30 DAYS AFTER THE COMPLETION <br />OF THE SITE-SPECIFIC VEGETATION SAMPLING. THE MIX SHALL NOT <br />INCLUDE ALFALFA OR SUNFLOWERS AS PROPOSED IN TABLE V-3. ALL <br />INTRODUCED SPECIES INCLUDED SHALL NAVE AN ACCOMPANYING JUSTIFICATION <br />ADDRESSING THE SECTIONS OF RULE 4.15.2. <br />Stipulation No. 10: <br />THE PERMITTEE AND THE DIVISION WILL JOINTLY ESTABLISH A MEANS FOR <br />THE EVALUATION OF SPECIES DIVERSITY WITHIN 120 DAYS OF PERMIT <br />ISSUANCE. <br />