.d~`. - <br />There is only one shaft being used at the Present; <br />and <br />this is a three compartment, one for. cage, one for <br />0 <br />bucket and one Yor the pipes.and ladders. Tha manway <br />has platforms e'uery 16 feet and era In good shape. <br />se <br />The mine has four axita besides main tunnel and are <br />ready and easily accessible to employes. <br />S T A T I S T I C S. <br />Total number of feet in shafts 2000, of this E00 feet <br />ve^e sunk during the year 1913: <br />About 40•miles of track in drifts and tunnels in the <br />mine. About~1000 feat of drifting was done during <br />the present gear. <br />Cost of powder $.15 per pound. Average per month $2000 <br />Cost of Fuel per ton $iz. <br />Cost of transporting ore per ton $4.00 <br />cost of ore treatment at maelter "$6,0o per ton. <br />Cost of milling $l.oo, ' <br />A~~erage assay value $30.00 per tori. <br />fl2 Peet of upreiee was done in 1913. <br />MF }1 Flf.PI~ OYEP. <br />1G machine drillmen $4.00 for S hours. <br />~ timbermen 4.00 " <br />8 timbormen 3.00 " • <br />53 trsncnera 3.00 '" <br />2 motormon 4.00 ~~ <br />7. cage tondors 3.00 " <br />1 laborer 3.00 " <br />'~ ongineere 4.00 " <br />P~unpman 4,00 " <br />4 blaokemiths 4.0~ " <br />1 teamster 3.50 " <br />1 foreman 8,00 " <br />4 shift boeeoe 4.00 ~~ <br />1 euperlntendent 10.00 " <br />1 ofPioo helper 6.00 " <br />95 milLnen from $E.00 to $5.00 for. 8 hours <br />C tramwaymen 3.50 for s hmirs. <br />.rif3tf <br />~!:.a~ ~ <br />;~LI~~F~I <br />,:~. <br />''!~';I ~ <br />~ I f,+~ i <br />',{ fir; '~' <br />~~ :, <br />' li <br />~~,i~~;4i~!I~) '~ <br />~.j-~~l i!.I <br />I d <br />~.ii <br />' I~~~I~. <br />~ I~.~~~' <br />i <br />i1 I~`!~ J ~ ; ~;. <br />~ i ~., <br />h~f', <br />1.~,!~ <br />,.~, <br />i ,' <br />~~ ! :V <br />~. <br />i ; <br />' I, !tF <br />'i ~I ,~ I ~,~I. <br />~', i ~ <br />~~ f ~~ ~,I~ <br />III~i4 II1~ <br />i~I i1{~I~~ '~ <br />I '~~~ ! <br />', ~ li • ~ <br />Il ~i~ ,' il'I'~ `i <br />Ii <br />i! <br />~~ <br />