My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MINEBK01099
DRMS
>
Day Forward
>
Mine Books
>
MINEBK01099
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2009 9:56:48 AM
Creation date
11/18/2007 12:27:12 PM
Metadata
Fields
Template:
Mine Books
County
Gunnison
Volume
16
Document
Inspectr
Suffix
A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />' ~i~ <br />Good Hope -3 <br />~` _ <br />:f <br />OnE S AI1D ORE B OD IE S - Contin. <br />!i phides, and porphyry, carrying gold and copper. The ores are <br />(~ smeltinP ores 15/100 shipping nigh <br />grade ore. 1,ietals, gold, <br />r silver, copper and silver. <br />S II•RFACE PLAI7T <br />~ ~i <br />'i~ <br />.~ <br />I~~ ~ ~ I~~j~it <br />~a„~.'~ <br />'~71 <br />i ~ ~;, <br />r <br />~~~ <br />'•,' Surface plant consists of one shaft house 10 x 12 <br />~; <br />~'~ with hoist 10 x 14. Foist is run by steam, with two boilers. <br />~Ii one 100 H. P. one 50 H. P. i4ater sul:ply is from creek. Also <br />smith shop located 40 feet from shaft. Ido boarding house, men <br />board in torn. Engine room and ore bins. <br />~I <br />E X P L O S I V E S <br />Du Pont 40;o powder. German Z. L. Inaoloid fuse and <br />5-X caps sad ~,:ooden tamping bars. Explosives in excess of one <br />day's supply are not stored underground. Average amount of er.- <br />plosivea kept in storage i.s 200 lbs. This is }:apt in a frame <br />building, aitaated 200 feet from shaft house and other buildings. <br />The device for thawing powder is a steam boiler. <br />L I I7 I is G & L: I Ii ii },; E T 13 U D S <br />,- <br />The main opening is a s}raft 725 feet deep with five <br />levels running off in both di;actions on the vein. 100 Peet <br />spart. C;orY. is being done in both sides of the s}ieft to <br />the erd line. Lioat of the ore has been taken out of T}o. 5 <br />level np to Ilo. 2 level, and all t}re work is being done by hand. <br />Ito machine drills. There is a crosscut at I7o. 1 level south to <br />the copper vein about 50 ft. Method of ore extraction is over- <br />hand atoping and drifting with single hand drills. T}~e method <br />of timbering is atull$.and square sets. ~imbera are Spruce <br />and Pine, prepared by a sawmill. underground tramming ie done <br />by..hend. Steel care are used for tramming. The system oY <br />ventilation ie natural. CB,adlee are used Yor lighting un¢er~ I~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.