Laserfiche WebLink
~` <br />Good Hope -4 <br />Lt2IdILT G ~ L:IIZL LIETHOD 3-C9ntin. <br />ground. There is a shaft with two compartments, provided <br />with ladder-way. <br />S T A T I S T I C S <br />Total number of feet in shafts 1100. Cost per ft. y^p2b.00 <br />Total number of feet in drifts and levels 3500. Coat per ft. X15 <br />Total numb or of feet in orosacuts 300. Cost per ft. ^y20.00 <br />Total number of feet in ~•rinzea and raises 350. <br />Total number of foet in development 52b0 <br />Coat of coal per ton, x`7.50 <br />Coat of timber.~"25.00 per thousand feet <br />Coat of powder w20.00 <br />Average assay value ore per ton X100. <br />Coat per ton mining of ore 10.00 <br />Cost per ton treatment of ore k9.00 <br />Coat per ton transportation of ore Y9.00 <br />LL3n employed: <br />2 Miners X3.00 for 8 hours. <br />1 Assayer 4.00 for 8 hours <br />2 Engineers 4.00 for fi hours <br />1 Superintendent G.00 for 8 hours. <br />Cost per ft. y10 <br />3EIr` ER AL RLLIARK S. <br />IJo person under the age of twelve years is employed in the Lune. <br />Strangers or visitors are not allowed underground unless <br />accompanied by a competent guide familiar with the mine. The <br />msnagement is supplied with blank accident reports.. The Mine <br />does not Derry indemnity inauranoe against accident. The <br />management is familiar tivith the statutes relating to the operation <br />of metalliferous mines. <br />Surface transportation is done by wagon, 13 miles to the railroad. <br />Hoisting engines are al.l equipped with indicators in plain view <br />of engineers. Engineer is experienced man. Men are raised <br />