Laserfiche WebLink
9- <br />'lien employed <br />9 machine drill men <br />9 ^ helpers <br />~10 ffiners <br />4 timbermen <br />1 labo ro r <br />2 engineers <br />1 Blaoksffith <br />1 Superintendent <br />1 Foremen <br />STATISTICS. <br />at $4.00 for 8 hours. <br />" 3.50 • " " <br />" 3.00 " " • <br />t. 3.50 ~ 4.00 " " " <br />" 3.00 • • r <br />" 4.00 " 12 • <br /> 3.50 8 " <br />Cost of Ebel ~5. per ton. Cast oP timbers, 50~/to #l.each. <br />Co et of steel, 22~ per lb. Oost of ponder, 14~ per lb. <br />The average assaq value of ore per ton is S8 to 113.17. <br />Co st of transportation X1.75 to $Z. per ton. <br />• concentrating, T5~ per ton. <br />III <br />