My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MINEBK00101
DRMS
>
Day Forward
>
Mine Books
>
MINEBK00101
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2009 9:30:34 AM
Creation date
11/18/2007 11:54:12 AM
Metadata
Fields
Template:
Mine Books
County
Clear Creek
Volume
9
Document
Inspectr
Suffix
A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9- <br />'lien employed <br />9 machine drill men <br />9 ^ helpers <br />~10 ffiners <br />4 timbermen <br />1 labo ro r <br />2 engineers <br />1 Blaoksffith <br />1 Superintendent <br />1 Foremen <br />STATISTICS. <br />at $4.00 for 8 hours. <br />" 3.50 • " " <br />" 3.00 " " • <br />t. 3.50 ~ 4.00 " " " <br />" 3.00 • • r <br />" 4.00 " 12 • <br /> 3.50 8 " <br />Cost of Ebel ~5. per ton. Cast oP timbers, 50~/to #l.each. <br />Co et of steel, 22~ per lb. Oost of ponder, 14~ per lb. <br />The average assaq value of ore per ton is S8 to 113.17. <br />Co st of transportation X1.75 to $Z. per ton. <br />• concentrating, T5~ per ton. <br />III <br />
The URL can be used to link to this page
Your browser does not support the video tag.