My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MINEBK00101
DRMS
>
Day Forward
>
Mine Books
>
MINEBK00101
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2009 9:30:34 AM
Creation date
11/18/2007 11:54:12 AM
Metadata
Fields
Template:
Mine Books
County
Clear Creek
Volume
9
Document
Inspectr
Suffix
A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-9- <br />~~en eaployed <br />9 machine drill men <br />9 ~ " helpers <br />!10 ffiners <br />4 timbennen <br />1 laborer <br />2 engineers <br />1 Blacksmith <br />1 Superintendent <br />1 Foreman <br />STATISTICS. <br />at $4.00 for 8 hours. <br />" 3.50 " n a <br />" 3.00 " " " <br />z 3.50 & 4.00 " " " <br />" 3.00 n " ^ <br />" 4.00 " 12 " <br /> 3.50 8 " <br />Coat of fuel ~5. per ton. Cost of timbers, 50~/to $l .each. <br />Co et of steel, 22~ per lb. ~ st of powder, 14~ per lb. <br />The average assay value of ore per ton is $8 to 113.17. <br />Coat of transportation $1.75 to $2. par ton. <br />" " concentrating, 75~ per ton. <br />
The URL can be used to link to this page
Your browser does not support the video tag.