Laserfiche WebLink
heel 1 of 2 <br />~;ado,Division of Ninerals and Geology <br />ESTIMATING FORM - NHEEL LOADER NORI <br />Task 1: 1 Prep. bY: SSS Task filename MOII-L <br />Date 11/18/94 Permit t:M-82-011 Nine: HillYer Pit <br />............ ......... ................................. <br />Permitting action General 11012) tYPe Permit bond recalculation <br />Task description Regrade lac. river channel B 2ac.ft./ac. <br />HOURLY EAUIPNENT COST <br />--------------------- Basic machine: CAT 966C <br />--------------------- <br />Attachment 11: ROPS Cab <br />Cost Breakdown - Ownership = 524.92 <br />""""""" -Operating loader = 519.45 <br />- Operator = 521.58 <br />Horsepower = 170 <br />Shift basis:l/day <br />(DAI hkm) <br />100 Z utilization <br />- Total cast/hr = 565.95 Total fleet cost/hr : 165.95 <br />MATERIAL AUANTITIES <br />Initial Swell Final <br />volume = 6,453.3 LCY factor : N/A volume : 6,453.3 LCY <br />Auantity source/reference : Max. Sac. disturb. less Sac. facil. area <br />S Swell source/reference : N/A <br />HOURLY PRODUCTION <br />----------------- <br />----------------- <br />Loader Cycle Time <br />................. <br />Unadjusted Basic Cycle Time (load, dump 6 maneuver) : 0.525 mire. <br />ICHB mk') <br />CYCIe live Factors: Factor lain.) <br />Material- Notarial 3/4' to 6' diaeeter 0.000 ICHB eda) <br />Pile- No adjustment -factor not applicable 0.000 (CHB eda) <br />Truck Ownership- No adjustment - factor not applicable 0.000 ICHB eda) <br />Operation- Constant operation -0.040 (CHB eda) <br />Target- No adjustment - factor not applicable 0.000 ICHB eda) <br /> Net Cycle Time Adj.= -0.040 min. <br />Adj. Basic CYCIe Time : 0.485 min. <br />