Laserfiche WebLink
RECLANATION CO'~IMNARY cant'd sl• 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No.. Task Description ~ Cost lfI <br />, <br />NA ~ None required <br />, <br />, <br />, , <br />Subtotal IK): <br />L. DRILL RULE/NONIIORING HELL SEALING <br />Task No.. Task Description ~ Cost (fl <br />`, , <br />NA None required <br />, <br />, <br />, <br />, , <br />, <br />, , <br />Subtotal (L): - - <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No.; Task Description Cost Ifl <br />2 ~ Deeolition Per attached worksheet (3,614 <br />3 ~ Seeding 250 willow sprig @ f3.00ea. coat. 6 lab.I 1750 <br />NA ) Fencing None required <br />4 .Mob/Deoob Per attached worksheet ~ f1,197 <br />Subtotal (M): f6,161 <br />------------ <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through N): 50,400 <br />----------- <br />II. INDIRECT COSTS <br />A. CONTRACTOR'S OVERHEAD 6 PROFIT <br />Itee No.. Itea Description ~ Cast (f) <br />1. ~ Public Liability Insurance.... 1.SSOS of dir. 5130 <br />2. Contractor's Perfor®ance Bond 0.9752 of dir. S82 <br />3. ~ Contractor's Profit........... 10.002 of dir. ~ 5540 <br />4. Jab Superintendent.. ~ 52,067 <br />Subtotal IA): 53,139 <br />TOTAL CONSTRUCTION CONTRACT ANOUNT (direct plus O 6 P): 511,539 <br />8. DHG PROJECT ADN[NISTRATION EKPEHSES <br />Itee Ha.. Item Description Cost (f) <br />, , <br />1. ~ Contract Prep., Eng. Fees..... 4.252 of cntr.; 5490 <br />2. Staff Adrain. Erpenses......... 0.752 of cntr.l E01 <br />NEi INDIRECT COST PERCENTAGE: 44.232 Subtotal (B): 5577 <br />TOTAL INDIRECT RECLANATION COSTS (subtotals A through B): f3,71G <br />------------ <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): 512,116 <br />