Laserfiche WebLink
<br />HOURLY PROOUCTIOH cont'd <br />----------------- <br />----------------- <br />Loader Cycle Time cant'd <br />Rolling Resistance <br />Roadway underfooting conditions: <br />Haul :Loose sand or gravel <br />Return:Loose sand or gravel <br />Grade <br />Length Resist <br />Haul d return Time: If t) (S) <br />-------------------------------------- <br />Haul Route: 150 0.00 <br />Return Route: 150 0.00 <br /> <br />Sheet 2 of 2 <br />Rolling Total Travel <br />Resist. Resist. Time <br />151 (il Imin.) <br />10.00 10.00 0.235 (CHB }mx) <br />10.00 10.00 0.197 (CHB wxY) <br />Total travel time = 0.432 <br />Total cycle time = 0.911 minutes <br />Loader Bucket Capacity <br />Rated Capacity= 4.00 LCY (heaped) <br />Bucket fill factor= O.R75 Loose oat.- 1' and over diameter (65 - 905) <br />Adjusted capacity= 3.50 LCY <br />Job Condition Correction Factors <br />Site altitude = 9,300 ft. <br />Altitude correction factor = I.OD (CHB cdhl <br />lob efficiency factor = O.N3 ilsh/day) <br />Net Correction = O.A3 multiplier <br />Unadjusted Hourly Unit Production 229.02 LCY/Hr <br />Adjusted Hourly Unit Production 190.09 LCY/Hr <br />Adjusted Hourly Fleet Production 140.09 LCY/Hr <br />JDB COST <br />Fleet site = 1 Loader(s) Total job time = 33.95 Hours <br />Unit cost = f0.347 /LCY Total job cost. = f2,238.BB <br />