Laserfiche WebLink
t 1,.~' ~.:.~ .d~.~_-mss `~ <br />Pond 8 New Elk P~4ine, Mav 2004 <br />Processing Waste <br />Survey stakes were noted on the operational surface of the RDA in preparation for a revision <br />to shape and reclaim the RDA. The operator has completed the survey and will submit the <br />revision in the near future. The 100-year ditch was traversed on foot and found in good <br />condition, although sedimentation will need to be cleaned from this ditch this season to <br />ensure future function. Recent runoff appears to have been contained within both <br />downdrams, although the east downdrain needs some work as noted in last month's <br />inspection. Terraces and outslopes appeared normal with no evidence of slumping due to <br />recent wet conditions. <br />Support Facilities <br />A local scrap dealer was on-site removing salvageable steel and iron. Materials from recent <br />demolition activities are required to be completely removed from the site in order to receive <br />any demolition credit in future bond release applications. <br />To soil <br />Please place a topsoil marker on the pile located at the topsoil borrow area at the West <br />Mine <br />