My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC38494
DRMS
>
Back File Migration
>
Inspection
>
INSPEC38494
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:43:33 PM
Creation date
11/18/2007 11:06:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
Inspection
Doc Date
10/9/1998
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION COST SUMMARY cont'd sheet 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No.~ Task Description ~ Cost (E) <br />2 ~ Seal Mayday 1 8 2 and Lamb edit, 3 edits ~ 5475 <br />Subtotal (K): E473 <br />L. DRILL HOLE/MONITORING HELL SEALING <br />Task No.l Task Description ~ Cost (E) <br />NA ~ Drill holes or monitoring wells not created <br />Subtotal (L): <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No.~ <br />________I <br />___________ Task Description ~ <br />_______________________________________I Cost (E) <br />____________ <br />3 ~ Demolition Assume 10'L•10'1ri10'H mass a 50.19/cf ~ 5190 <br />4 ~ Seeding Per attached task 4 worksheet ~ E1,636 <br />NA ~ Fencing Fencing not required at this time <br />5 ~ Mob/Demob Per attached task 5 worksheet ~ E1,204 <br />Subtotal (M ): E3, 030 <br />------------ <br />TOTAL DIRECT RECLAMATION COSTS (suhtotaLs A through M): 54,282 <br />____________ <br />iI. INDIRECT COSTS <br />________________________________________________________________________ <br />___ _______________________________________ ________ <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT <br />I iem No.l Item Description ~ Cost (E) <br />________I__________________________________________________I____________ <br />1. ~ Public Liability Insurance.... 1.SSOX of dir. ~ Sbb <br />2. ~ Contractor's Performance Bond 1.5 SOX of dir. ~ E66 <br />3. ~ Contractor's Profit........... 10.OOX of dir. ~ E428 <br />4. ~ Job Superintendent..equip. op. serves as super. <br />Subtotal (A): E561 <br />____________ <br />TOTAL LONSTROCT ION CONTRACT AMOUNT (direct plus 0 8 P): E4,843 <br />B. DMG PROJECT ADMINISTRATION EXPENSES <br />Item No.~ Item Description ~ Cost (E) <br />________I______________________________.__________________I____________ <br />1. ~ Minerals Program Adm 5.007. of cntr.l E242 <br />________________________________________________________________________ <br />NET INDIRECT LOST PERCENTAGE: 18.76X Subtotal (B): E242 <br />TOTAL INDIRECT RECLAMATION COSTS (suhtotals A through B): E803 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): E5,085 <br />
The URL can be used to link to this page
Your browser does not support the video tag.