Laserfiche WebLink
<br />RECLAMATION COST SUMMARY cont'd sheet 3 of 4 <br />H. EARTHWORK - STREAM CHANNEL RECONSTRUCTION <br />Task <br />____ No.~ <br />_ <br />~____ Task Description ~ Lost (E) <br />_ <br />NA __I_______ <br />______ <br />~ No[ indicated in _____________________________ <br />reclamation plan ___I___.,________ <br /> Subtotal (H): <br /> <br />1. <br />EARTHWORK - DRAINAGE ____________ <br />CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task <br />_____ No.~ <br />___ <br />___ <br />,.____ Task Description <br />_ I Cos[ (E) <br />________ <br />NA I <br />____ <br />______ <br />~ Drainage control _____________ <br />_______________ <br />included under task T ___I____ <br />~ <br />Subtotal (1 ): <br />J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.~ Task Description ~ Cost (E) <br />NA ~ Not indicated in reclamation plan <br />Subtotal (J): <br />