Laserfiche WebLink
~ol orado Division of Minerals and Geology • <br />_________________________________________ <br />ESTIMATING FORM - HYDRAULIC E%CAVATOR WORK <br />Task #: 1 Prep. by: NHE Task File Name: M185-1 <br />Date: 10/09/98 Permit #:M-81-185 Mine: Mayday Mine <br />Permit Action: General 110(2) permit bond recalculation. <br />Task Description: Cut terraces/berms on muck piles, scale portal face <br />HOURLY EQUIPMENT COST <br />_____________________ <br />_____________________ <br />Basic Machine: <br />CAT 320 <br />Shift Basis:l/day <br />Cost Breakdown: ------------------ --------- <br />-------------- Utilization X Horsepower 128 <br />Ownership cost/hr = 521.55 N/A --------- <br />Operating 8 overhaul cost/h r= 523.10 100 Neigh t-tons: <br />Operator cost/hr = 523.30 N/A --------- <br /> -------- (DQI OSII) <br />Total egpt. unit cost/hr = 567.96 Total fleet cost/hr: 567.96 <br />MATERIAL QUANTITIES <br />]nitial Swell Loose <br />Volume: 1,742.0 LCY Factor: N/A Volume: 1,742.0 cu. yds. <br />Source of quantity t ake-off: Terraces 10~L, 1H: 1V cut on 2H: 1V slope, 950~L <br />Source of es[. swell factor: NA <br />HOURLY PRODUCTION <br />_________________ <br />_________________ <br />Cycle Time - Basic <br />cycle time vs. job condition rating: <br />BELOW AVG. <br />---------- - Time Value within basic rating: MEAN <br /> Basic cycle time = 0.36 min. <br />Bucket Capacity ------------- <br />Rated capacity: 1.57 LCY (heaped) Size class: large <br />Bucket fill factor: 0.83 Blasted rock - avg. blasted (75 - 90X) <br />Adjusted capacity: 1.30 LCY <br />Job Condition Correc tion Factors - Altitude adj. = 0.85 (CHB) <br />-------------------- ------------ - Job efficiency = 0.83 (1s/d Ylip) <br />Site altitude = 9,000 ft. ----------- <br /> ------- Net correction 0.71 <br />Unadjusted hourly unit production 215.28 LCY/Hr <br />Adjusted hourly unit production : 151.88 LCY/Hr <br />Adjusted hourly fleet production 151-88 LCY/Hr <br />JOB COST <br />Fleet Size: 1 Excavato <br />-_____ r(s) Total Job Time: 11.47 <br />---- Hours <br />Unit Cost - <br />50.447 /cu. yd. Total Job Cost: -----__ <br />5779.47 <br />