Laserfiche WebLink
<br /> <br />III. Problems, Recommendations and Compliance Dates <br />The operator is advised that the following problems have been identified during the inspection <br />and that failure to correct the problems may result in the Division taking an ENFORC5MENT ACTION <br />pursuant to CRS 2973, as amended, 34-33-123. (Recommendations and compliance dates are to be <br />clearly noted. Dates are to be specific, e.g., January 31, 1981 and underlined) <br />1. Material in ditch D at NW corner. Remove material and reestablish ditch by <br />March 15. 1981. <br />2. Finish resloping of embankment at pond B behind primary spillway by March 15, 1981. <br />3. Regrade and trim embankment at Mann Draw by March 15, 1981. <br />4. Riprap needs to be placed below sediment pond principal spillways and below outflows <br />of haul road culverts by March 15, 1981. <br />5. The diversion from pond A primarily spillway to Mann Draw must be deepened at the <br />light use road crossing by March 15, 1981. <br />