<br />N. Status of Problem Resolution <br />The following items concern problems identified at previous inspection. Problems are classified <br />into three categories. These are: (1) problems resolved; (2) resolution still in process; and <br />(3) operator delinquent. The date that the problem is resolved or the date that the operator <br />is deemed delinquent is to be clearly stated. <br />Problems Resolved <br />1. The Division received plans within the Permanent Program Submission on February 6, <br />1981 which detail designs for sediment pond C which will control ditch D runoff. <br />Resolution in Progress <br />1. Some riprap has been placed below the haul road culverts. However, additional <br />riprap should be placed below all road culverts and riprap must be placed below <br />principal spillways by March 15, 1981. <br />2. Ground thaw has occurred sufficiently to allow trimming and regrading of the Mann <br />Draw embankment by March 15, 1981. <br />