Laserfiche WebLink
<br />CIRCES Cost EstlmatinD Sokware <br />BULLDOZER WORK <br />JTIFICATION <br />Agenry or organization name :Colorado Dinsion Ol Minerals 8 Geology <br /> <br />Task k . 001 State : Colorado PertniVObk : M-90-098 <br />Dale: 02/162000 County:Weld Abhrewation :none <br />User: TAS Si[e :Perry Pit Filename:M096-007 <br />Permit or other job action : Final Reclamation <br />Task descnption : Regrade 2,500 LF. shoreline slope; 2:1 to 3:1 <br />HOURLY EQUIPMENT COST Basrc machine :Cat OBN (/995) Horsepower: 285 <br />Blade type :Semi-Universal <br />Adachmant no. 1 : BOPS Cab Shitt basis : I per day <br />ANachmenl no. 2: NA <br /> <br /> Utilization o Cost data source : (CRC) <br />Cast Breakdown ~ Ownership corUhour: $35.77 NA <br />Ope2ting cosUhour: $55.64 700 <br />Ripper op. costfiour: $0.00 NA <br />Ope2lor cosMour: $23.12 NA <br />Total unit cosVhour: $113.93 Total lleet cosbhour: §227.66 <br />MAT RIA O fANTRI ~ <br />Initial Swall Loose <br />volume: 12,730 CCY factor: 1.050 volume: 13,366 LCV <br />Source of quantity takeoN :permit <br /> <br />Source of est. swell factor :program <br /> <br />HOURLY PRODUCTION <br />n <br />Average push tlistance : 50 lest Source <br />Unatljustetl hourly production : 7180 LCY/hr <br />Matenal consistenry description <br />Wet, hghly cohesive <br />Average push gradient: 3.00 %(negJ <br />Avenge Site altitude : 5.500 lest <br />Matedal weight : 3.400 Ibs/LCY <br />Matedal weight description <br />Sand and gravel-Wet <br />!OB TIME AND GOAT <br />FIe91 size : 2 Do:er(s) <br />Umt cost: .50.379 /LCY <br />Operator skill: 0.75 (a vg <br />Matedal consistenry: 0.80 (Call <br />Danng method : 1.20 (s-by <br />Visibility: r.00 (avg <br />Job eNicienry: 083 (7shiW <br />Spoil pile : 0.70 (1nd-r <br />Push gradient: 1.07 (Ca7 i <br />Alatude : 1.00 (Car I <br />Material weight: 0.68 (Carl <br />Blade type : 1.00 (S or <br />Nel cortection : 0.30 <br />Adjusted unit production : 356.87 LCY/hr <br />Atlfustetl Ileet production : 713.75 LCY/hr <br />Total job time: 18.73 Hours <br />Total job cost : ¢1,267 <br />