My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC34222
DRMS
>
Back File Migration
>
Inspection
>
INSPEC34222
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:36:33 PM
Creation date
11/18/2007 10:45:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990098
IBM Index Class Name
Inspection
Doc Name
MINERALS PROGRAM INSPECTION REPORT
Inspection Date
2/15/2000
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />RECLAMATION COSTS <br /> <br />EXfi2B=T L <br />These reclamation costs are based on the maximum amount of <br />disturbance which would occur during the mining operation. We <br />have identified this point when the mining is about half way <br />through Phase I, when the portable asphalt batch plant is located <br />on the. site, the portable crusher/screening plant is on the site, <br />stockpiles of off-site material (mainly concrete and asphalt for <br />recycling) are located on-site and there are approximately 2-3 <br />years worth of stockpiled overburden and topsoil. <br />This exhibit corresponds with the Table of Disturbance in Exhibit <br />D. The main access road will remain after mining to provide <br />access to the Barrett Energy gas well on the property. This road <br />has not been included in the disturbance calculations. <br />Haior Disturbance <br />Item ,~_, <br />No. Item=fir?. <br />1. Replace overburden on <br />3 acre stripped area <br />2. Scarify overburden and <br />.topsoil stockpile areas, <br />4.0 acres <br />3. Spread topsoil at 6-12' <br />on 3 acre stripped area <br />and 2.5 acre setback and <br />slope area <br />4. Seed, fertilize, mulch <br />SUBTOTAL <br />Hoderate Disturbance <br />5. Scarify two plant sites, <br />scale house <br />6. Seed, fertilize, mulch <br />SUBTOTAL <br />~~~ ~~ ~~ <br />C06t/ <br />Amount Units Unit <br />/ ~~/7 ~ CY I S .80 <br />I I <br />I I <br />I I <br />19,360 I SY I S .15 <br />I I <br />I I <br />I I <br />I I <br />8,873 I CY 15 .80 <br />I I <br />9.5 I AC 15500.00 <br />Cost <br />I /l to//{ <br />I S -~4~-00- <br />I <br />i <br />I <br />IS 2,904.00 <br />I <br />I <br />I <br />I <br />IS 7,099.00 <br />I <br />IS 4,750.00 <br />522,497.00 <br />I I <br />I I <br />I I <br />172,600 I I <br />I <br />I <br />SY I <br /> <br /> <br />.15 I <br />I <br />I <br />IS10,890.00 <br />I <br />I 15.0 I <br />I AC I <br />15500.00 I <br />IS 7,500.00 <br />~S I,OJC%3 <br />L-1 -i 'il' <br />S18,390.00 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.