My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC34222
DRMS
>
Back File Migration
>
Inspection
>
INSPEC34222
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:36:33 PM
Creation date
11/18/2007 10:45:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990098
IBM Index Class Name
Inspection
Doc Name
MINERALS PROGRAM INSPECTION REPORT
Inspection Date
2/15/2000
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CIRCES Cost EstimatinD Software <br />BULLDOZER RIPPING WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : Division Ol Minerals 8 Geplogy <br />Task p : 002 State :Colorado PermiVjob a : M-90-098 <br />Date : 02/1&2000 County :Weld Ahbreviabon :none <br />User: TAS Sita :Perry Pil Filename:M096-002 <br />Permit or olherlob action :Scanty 16 acre plant site 8 stockpile area <br />rack descdpbon :Final Reclamation <br />Cowl Breaktlown <br />Seismic <br />method <br />Area <br />method <br />Basic machine:Car DeN (1996) Horsepower: 285 <br />BWde type: Universal <br />Attachment no. 1 : ROPS Cab Shill basis : 1 per day <br />Attachment no. 2:7-shank ripper <br /> Utilization % Cost data 5oume : (CRC) <br />Ownership cost hour: 54730 NA <br />Operating cosuhour: 555.917 l0.'1 <br />Ripper op. cosUhour: 56.94 100 <br />Operator cosVhour: 523.12 NA <br />Total unit cosMour: 5127.26 Total Ileet cosUhr: 5254.52 <br />Selened estimating method : Alex <br />NA NA Lcatl lector. NA Bank volume: NA BCY <br />15.00 Acres Rip depth (h): 2.00 <br />Source of guantiry takeoff <br />Source of material loatl lector : NA <br />Seismic method : Material seismic veloary : NA feet par second <br />Unadjusted houdy production : NA BCY or CCY/hr <br />Area mehod : Aveage ripping tlepth per pass : 0.50 leer <br />Average ripping width per pass : 7.08 lest <br />Avemge ripping length per pass : 300.00 feet <br />Average velocity of machine : 86.00 lest per minute <br />Average machine maneuver time/pass: 0.25 minutes <br />Houdy protluttion per unit area : 0600 acres per hour <br />Unadjusted houry pmtluaion : 64x.97 BCY or CCY/hr <br />Correction lectors ~ Unadjusted Hourly Droducbon : 644.97 BCV or CCY/hr <br />Site altitude : 5.300 leer <br />Alulude adjustment: I.00 (Car HBJ <br />Job efficiency lector: 0.83 (l shifVdayJ <br />Net lob correction : 0.63 multiplier <br />Adjusted hourly unit production : 535.32 BCV or CCY/hr <br />Atlrysted hourry Ileet production : 7,070.6$ BCV or CCV/hr <br /> <br />.rOB TIM AND OAT <br />Fleet size : 2 Dozers) <br />Total job time <br />: 45.21 Hours <br />Unit cost: 50.238 /LCV Total job cost : $11,506 <br />volume : 48,400 BCV or CCY <br />
The URL can be used to link to this page
Your browser does not support the video tag.