Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd sheet 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task <br />_____ No.~ <br />___I__________ <br />~ <br />~ <br />~ <br />___.,____ Task <br />_____ Description <br />_____________________ ~ Cost (E) <br />______~__________ <br />~ <br />~ <br />~ <br />Subto[aL (K ): <br />L. DRILL HOLE/MONITORING NE LL SEALING <br />Task <br />_____ No.~ Task Description <br />_.._I_____________________________..________ ~ <br />____________,_ Cost (5) <br />___________ <br />_____ __________________________________________ ______________ <br />Subtotal (U: ___________ <br /> <br />N. <br />MISLE LLANEWS RECLAMATION TASKS _ ___________ <br />Task No.~ Task Description ~ Cost (E) <br /> 6 ~ Dewa [eying ~ f22, 600 <br /> ~ Demolition <br /> 7 ~ Seeding (20.5 acres x SSOOlac re) ~ 510,250 <br /> Fencing <br /> 8 ~ Mob/Demob ~ EL,250 <br /> Subtotal (M): f34, 100 <br /> TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): 578,387 <br />II. INDIRECT COSTS <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT <br />Item No.~ Item Description ~ Los[ (S) <br />________I_ <br />1. ~ ____~_______.._______________..____ <br />Public liability Insurance.... ___..____ <br />1.SSOX ________ <br />of dir. ~ ___________. <br />57,215 <br />2. ~ Lont rac toy's Performance Bond 1.530Y. of dir. ~ 51,215 <br />3. ~ Contractor's Profit........... 10.OOX of dir. ~ f7,839 <br />L. ~ Job Superintendent.. <br />Subtotal (A): 510,269 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): 588,656 <br />____________ <br />B. OMG PROJECT ADMINISTRATION EXPENSES <br />Item No.~ Item Description ~ Cost (S) <br />1. ~ Minerals Program Admin. Fee a[ S.OOX of cntr.~ 54,433 <br />NET INDIRECT COST PERCENTAGE: 18.76k Subtotal (B): ~E4,43S <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): 51L, 701 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): f93,088 <br />