Laserfiche WebLink
~' <br />RECLAMATION COST SUMMARY cont'd sheet 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Tesk No.~ Tesk Description ~ Cost (f) <br />Subtotal (K): <br />L. DRILL HOLE/MONITORING NE LL SEALING <br />Task No.~ Task Description ~ Cost (S) <br />________I__________________________________________________I_____~.____ <br />Subtotal (L): <br />N. MISCELLANEOUS RECLAMATION TASKS <br />Task No.~ Tesk Description ~ Cost tf) <br />Demolition <br />3 ~ Seeding ravage 5 acres ~ f2, 198 <br />Fencing <br />4 ~ Mob/Demob one d7 dozer ~ f1, 500 <br />Subtotal (M): 53,698 <br />____________ <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): fb, 829 <br />ll. INDIRECT COSTS <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT <br />Item No.~ Item Description ~ Cost (f) <br />1. ~ Public Liability Insurance.... 1.550% of dir. ~ f106 <br />2. ~ Contractor's Performance Bond 0.975% of dir. ~ fb7 <br />3. ~ Contractor's Profit........... 10.00% of dir. ~ SG83 <br />4. ~ Job Superintendent.. <br /> Subtotal (A): f855 <br /> <br />TOTA _ <br />L CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): ___________ <br />57,684 <br /> <br />B. DNC <br />PROJECT ADNINI STRAT ION EKPENSES _ ___________ <br />Item No.~ <br />___~~~__ I Item Description <br />~_~___.._~___.._~___~_~___.._____~_~~_ ~ <br />_~__~~_..__~~_.._ I _ Cost (f) <br />~..____..~___ <br />1. ~ Minerals Program Admin. Fee et 5.00% of cntr.~ f384 <br />NET INDIRECT COST PERCENTAGE: 18.15% Subtotal (B): 5384 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): 51,240 <br />____________ <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): 58,069 <br />