Laserfiche WebLink
i • <br />Colorado Division of Minerals and Geology <br />ESTIMATING FORM - BULLD02ER 1K1RK <br />Task C: 1 Prep, try: BK Task File Name: M133-1 <br />Date: 11/28/95 Permit p:M-91-133 Mine: Valdez Pi[ <br />Permit Action: warranty reduction <br />Task Description: recalculate warranty <br />XOURLT EOUI PMENT COST <br />_-=_________________ Basic Machine: Ce[ D7H SERIES II Xorsepower: 215 <br />Blade Type: UNIVERSAL --------- <br />AttachmenC if1: RODS Cab Shift Basis: 1/day <br />Attachment N2: 3-shank ripper --------- <br />Cost Breakdown: <br />-------------- Utilization X <br />Ownership cost/hr = 538.70 N/A <br />Operating & overhaul cost/hr- dozer = 537.95 100 <br />-ripper = 52.32 50 <br />Operator cost/hr = 522.95 N/A <br />Total egpt. unit cost/hr = 5101.91 Total fleet cost/hr: 5101.91 <br />MATERIAL DUANTITIES <br />Initial-=--------- Swell Loose <br />Volume: 6,694.0 BCY Fec tar: 1.250 Volume: 8,367.5 LCY <br />Source of quanCity take-off: 2 <br />Source of est. swell factor: 2 <br />HOURLY PRODUCTION <br />_____________ ___ Job Condition Correct ion Factors <br />Avg. push distance: 150 ft. --------------------- ----------- <br />- -------- Operator.......... 0.75 (avg.) <br />Unadjusted hourly Mat. consistency.. 1.20 (Cat tbl) <br />dozer producCion: 524 LCY/hr Dozing method..... 1.20 (slot) <br />- -------- Visi bilitY•----••- : 1.00 (avg.) <br />Materiel consistency: Job efficiency.... 0.83 (1sh/day) <br />Loose stockpile Spoil pile factor. 0.90 (ssd-fc) <br />__-___~___~_.,______ ________ ____~__ push gradient..... 1.05 (Cat tbl) <br />Avg. push gradient: 2.00 X (nag) Altitude deretion. 1.00 (Cat tbl) <br />- -------- Material weight... 1.00 (Cat tbl) <br />Avg. site el tiCUde: 7000 ft. Blade type........ 1.00 (S, SU, U) <br />Material weight 2300.00 lb/LCY Net Job Correction 0.84 <br /> <br />GENERAL FILL Adjusted Unit Prod.: 442.47 LCY/hr <br /> Adjusted Fleet Production: 442.47 LCY{hr <br />JOB COST ----------- <br />Fleet size 1 Dozers) Total Job Tine: 18.91 Nours <br />Unit Cost 50.230 /LCY Total Job Cos C: 51,927.21 <br />