Laserfiche WebLink
<br />RECLAMATION COST SUMMARY cont'd sheet 3 of 4 <br />N. EARTN(pRK - STREAM CHANNEL RECONSTRUCTION <br />Task <br />___~ No.~ <br />___I__.___.. <br />__...___. Task Description <br />,_______________.,_.____._______ ~ Cost <br />____I_.___._ (2) <br />..__._ <br />Subtotal (H ): <br />------------ <br />I. EARTH{K)RK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.l Task Description ~ Cost (S) <br />Subtotal (I): <br />J. EARTH40RK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.~ Task Description ~ Cost (2) <br />___.____I________________________________,._..____..________I____________ <br />2 ~ place 6"top soil ~ 2T, 204 <br />Subtotal (J): 27,204 <br />