My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_INSPECTION - M1979165 (9)
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1979165
>
_INSPECTION - M1979165 (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 4:21:11 PM
Creation date
11/18/2007 10:33:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979165
IBM Index Class Name
Inspection
Doc Name
MINERALS PROGRAM INSPECTION REPORT
Inspection Date
4/3/1996
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> ROADABLE EQUIPMENT: sheet 2 of 2 <br /> -------- Total Etp. Fleet Size Haul Trip Return Trip <br /> Machine Description Cost/hr (no. hauled) Cost/hr Cost/hr <br /> Subtotals : SO.QU $0.00 <br /> MOB/DEMOB SUPPORT EQUIPMENT: - -------- <br /> -------------^^------ Weight Ownership Haul Rig Fleet Size Haul Trip Return Trip DOT Permit <br /> Non-Roadable Eqp. Description (tans) Cost/hr Cost/hr (no. hauled) Cost/hr Lost/hr Cost/ea <br /> Subtotals $0.00 SO.00 SO.00 <br /> Total Eqp. Fleet Size Haul Trip Return Trip <br /> Roadable Eqp. Description Cost/hr (no. hauled) Cost/hr Cost/hr <br /> ------------------------------------------------------------------------------------------------------- <br /> ------------------------------------------------------------------------------------------------------- <br /> Subtotals $0.00 $0.00 <br /> EQUIPMENT HAUL DISTANCE 8 TIME <br /> Nearest major city or town within project area region: Commerce City <br /> -- ---------------- <br /> Total one way travel distance = 5.0 miles. Average travel speed = 30.00 mph. <br /> Job Time - Non Roadable Equip.= 0.50 hours load Roadable Equip.= M/A hours load <br /> 0.17 hours haul 0.17 hours haul <br /> 0.50 hours unload M/A hours unload <br /> 0.17 hours return 0.17 hours return <br /> --------------------- ---------------------- <br /> JOB COST Total Mob/Demob Cost = $1,068.37 <br /> --------- ------------- <br /> --------- ------------- <br /> NOTE: Non-roadable equipment (haul rig required to transport) mob/demob costs based on 2 round trips, each trip <br /> consisting of a one-way loaded haul and a one-way empty return. Roadable equipment (no haul rig required) <br /> costs based on one round trip. Colorado DOT requires special permits for oversize equipment on certain <br /> specified road segments within the State. Separate permits are required for each rig on each loaded trip. <br /> Additionally, pilot cars (one or two per rig depending on degree of oversize) are also required for oversize <br /> equipment hauling, and loading/unloading times must be increased substantially for equipment which must be <br /> partially dismantled for transport and re-assembled at the job site. Costs for lifting equipment and other <br /> support equipment needed for this work should be included in the mob/demob costs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.