Laserfiche WebLink
Colorado Division of Minerals and Geology sheet 1 of 2 <br /> ESTIMATING FORM - EQUIPMENT MOBILIZATION / DEMOBILIZATION <br /> Task #... 4 Prep. by CLK Fitename..M165-4 <br /> Date..... 05-A r-96 Permit # M-79-165 Mine......Frei Pit #3 <br /> Permit Action........ RecaLculation of financial warranty <br /> __��___�_______�_______�______.W__ --_______________� _ <br /> Task Description..... Mobilize/demobilize equipment <br /> HOURLY EQUIPMENT COST <br /> NOTE - This is a list to select from, not a list of mandatory items to include. <br /> Mob/Demob Eqp. -Tractor : 6x4, 75,000 Lb GW, 375 HP, diesel powered <br /> -Lt. Trailer : 25 ton folding gooseneck, drop deck <br /> -Ned. Trailer 50 ton folding gooseneck, drop deck <br /> -Hvy. Trailer 120 Ton folding gooseneck, drop deck <br /> -Pilot Car On-highway light duty truck, 4x2, 130 hp, 1/2 ton rating, gasoline powered <br /> -Hyd. Crane Grove RT58D rough terrain hydraulic crane, 20 ton capacity, 125 hp, 60 ft. boar <br /> -Fuel Truck 6x4, 3,600 gallon capacity, 210 HP, diesel powered <br /> -tube Truck 6x4, 2,500 gallon capacity, 210 HP, diesel powered <br /> -Flatbed Truck: 20,000 lb GW, 175 HP, diesel powered <br /> Lest Update: <br /> December, 1994 <br /> --------------- Lt. Rig Med.Rig Nvy.Rig Pilot Hydraulic Fuel Lube Flatbed <br /> Cost Breakdown: c25 T. 26-50 T. > 50 T. Car Crane Truck Truck Truck <br /> Ownership Cost/hr = $27.88 S31.Z3 $38.36 $1.81 $19.89 $6.95 S12.79 S5.71 <br /> Operating Cost/hr = S26.84 $29.29 $34.27 S5.12 S23.40 S18.53 $24.52 $8.00 <br /> operator Cost/hr = S21.40 $22.03 $22.03 $21.24 $20.86 S21.24 S21.24 $21.24 <br /> Helper Cost/hr = S20.60 S21.24 $21.24 SO.00 $0.00 $0.00 $0.00 $0.00 <br /> ------- ------- ------- ------- ------- ------- ------- -'----- <br /> Total = S96.72 $103.79 $115.90 $28.17 $64.15 S46.72 $58.55 $34.95 <br /> NON-ROADABLE EQUIPMENT: <br /> ----------------____ weight Ownership Haut Rig Fleet Size Haut Trip Return Trip DOT Permit <br /> Machine Description (tons) Cost/hr Cost/hr (no. hauled) Cost/hr Cost/hr Cost/ea <br /> CAT DBN 40.00 $40.05 $103.79 2 $287.68 S207.58 <br /> Revegetation equipment 15.00 $30.00 $96.72 1 $126.72 $96.72 <br /> Subtotals S414.40 S304.30 $0.00 <br />