Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 001 <br />Date : 05/22/2003 <br />User : WHE <br />Agency or organization name :DMG <br />Permit or other job action ;SO-Of <br />Task description :Glade pit area <br />PermiUjob# : M-1992-049 <br />Abbreviation :none <br />Filename : M049-001 <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D5G XL - 5P Horsepower : 90 <br />81ade type :Power Angle Tilt <br />Attachment no. 1 :BOPS Cab Shift basis : 1 per day <br />Attachment no. 2 :NA <br />Data source : (CRG) <br />Cost Breakdown : Ownership cosUhour <br />Operating cosUhour <br />Ripper op. cosUhour <br />Operator cosUhour <br />Total unit cost/hour <br />Utilization <br />$12.14 NA <br />$18.64 100 <br />$0.00 NA <br />$24.01 NA <br />$54.7g Total fleet cost hour : $54.79 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 3,227 LCY factor : NA volume : 3,227 LCY <br />Source of estimated volume :(2ac)(43560sf{ac)(1'D)127 = 3226.7 cy <br />Source of estimated swell factorNA _ ... ::. >:. <br />State :Colorado <br />County :Ouray <br />Site :Peck Pit <br />HOURLY PRODUCTION <br />Average push distance : 50 feet <br />Unadjusted hourly production : 464.3 LCY/hr <br />Material consistency description <br />Comoacted fill or embankment <br />Average push gradient : 0.00 % (F <br />Average site altitude : 7,200 feet <br />Material weight <br />Weight description <br />Sand and gravel -Wet <br />Adjusted unit production <br />Adjusted fleet production <br />JOIi TIME AND COST <br />Fleet size : 1 Dozers) Total job time <br />Unit cost : $0.389 /LCY Total job cost <br />3,400 Ibs/LCY <br />Job Condition Correction Factors <br />Operator skill <br />Material consistency <br />Dozing method <br />Visibility <br />Job efficiency <br />Spoil pile <br />Push gradient <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />0.75 <br />0.90 <br />1.00 <br />1.00 <br />0.83 <br />0.80 <br />1.00 <br />1.00 <br />0.68 <br />1.00 <br />0.30 <br />Source <br />140.72 LCY/hr <br />140.72 LCY/hr <br />yy,g3 Hours <br />