Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Date : 22-May-2003 <br />User : WHE <br />Permit orjob no.: M-1992-049 <br />Abbreviation : none <br />Filename : M049-000 <br />Agency or organization name :DMG <br />Permit orjob action :SO-Ol <br />_....... <br />TASK LIST (DIRECT COSTS) <br />NO. TASK DESCRIPTION <br />FORM <br />USED <br />FLEET <br />SIZE <br />TASK <br />HOURS <br />DIRECT <br />COST <br /> <br />001 -Grade pit area dozer 1 22.9 $1,256 <br /> <br />002 -Construct llood control berm 300'L w/3H:1V slopes dozer 1 15.1 $830 <br /> <br />003 -Haul reclamation equipment to and from job site mobilize 1 2.7 $244 <br /> <br />004 -Remove mist debris, assume f0' ' 10" i0' ~ $0.22/cf NA 1 4.0 $220 <br />'includes inflation factor adjustment of : NA <br />INDIRECT COSTS <br />sueroTALS: 44,78 $2,550 <br />TOTAL DIRECT COST `_ $2,550 <br />OVERHEAD AND PROFIT • LIablity IDSUranCe : 1.55 % Of dlreCf total = $40 <br />Performance bond : 1.05 % of direct total = $27 <br />Job superintendent : NA' ~ NA NA total = NA <br />Profit : 10.00 % of direct total = $255 <br />`not required (or eqp. operator serves as super.) TOTAL O 8 P = $321 <br />LEGAL-ENGINEERING-PROJECT MANAGEMENT- CONTRACT AMOUNT (direq+O&P)= $2,871 <br />Financial warranty processing (legal/related costs) : 0.00 total $ NA total = $0 <br />Engineering work and/or contracUbid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $144 <br />CONTINGENCY- NA` NA total= NA <br />'contingencies accounted for at task level TOTAL INDIRECT COST = $465 <br /> TOTAL BOND AMOUNT (direct+ indirect) _ $3,015 <br />Site :Peck Pit <br />State :Colorado <br />County :Ouray <br />~~~~,~ <br />m~F~C E <br />