My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC29998
DRMS
>
Back File Migration
>
Inspection
>
INSPEC29998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:33:11 PM
Creation date
11/18/2007 10:24:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992049
IBM Index Class Name
Inspection
Doc Name
Inspection Report
From
DMG
To
Peck Inc.
Inspection Date
4/30/2003
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 002 <br />Date : 05/22/2003 <br />User: WHE <br />County :Ouray <br />Site :Peck Pit <br />PermiUjob# : M-1992-049 <br />Abbreviation :none <br />Filename : M049-002 <br />Agency or organization name :DMG <br />Permit or otherjob action :SO-Ol <br />Task description :Construct flood control berm 400'L w/3H:1V <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D5G XL - 5P Horsepower : 90 <br />Blade type :POwerAngle Tilt <br />Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 : NA <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $12.14 NA <br /> Operating cosUhour : $18.64 100 <br /> Ripper op. cosUhour : $0.00 NA <br /> Operator cosUhour : $24.01 NA <br /> Total unit cosUhour : $54.79 Total fleet cosVhour : $54.79 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 2,133 LCY factor : NA volume : 2,133 LCY <br /> <br />Source of estimated volume : ((48'W)(8'H)/2)(300'L)/27 = 2133.3 cy <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 464.3 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-rt) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,200 feet Material weight : 0.68 (Cat HB) <br /> Blade type : 1.00 (PAT) <br />Material weight : 3,400 Ibs/LCY Net correction : 0.30 <br />Weight description <br />Sand and gravel -Wet <br />Adjusted unit production : 140.72 LCY/hr <br />Adjusted fleet production : 140.72 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 15.16 Hours <br />Unit cost : $0.389 /LCY Total job cost : $830 <br />State :Colorado <br />
The URL can be used to link to this page
Your browser does not support the video tag.