Laserfiche WebLink
Colowyo C-1981-019 <br />16 November 2005 <br />Pg 5/5 <br />Special Categories of Mining (Highwall Miner): -The highwall miner has completed <br />mining in the C-seam in the East Pit and has moved to the West Pit. In the West Pit it <br />has completed its work on the D-seam in the Section 4 area (the TR-60 lease <br />modification area) and is currently waiting for more areas to be opened and <br />prepared, The operators are taking the month of December off and will return to the <br />site in January, They will mine the upper seams in the West Pit and return to mine the <br />B-seam in the East Pit. <br />East Pit fire Area: - In September, an ember from a coal shot in the West Pit (during <br />high winds) made its way to the East Pit reclamation and started a fire, The fire was <br />contained by cutting a fire line around the area with a grader. The width of the fire <br />line is approximately 20 feet. The area that was burned was approximately 38 acres <br />and included what appeared to be a test plot labeled 1999A. Although there was a <br />fire, the damage to the area appears to be minimal. Approximately half of the <br />grasses remain and most of the remaining grass still has seed heads, The damage <br />caused by the fire line was also minimal. The line was not cut into the topsoil or spoil <br />but, rather, appears to have just removed the majority of the vegetation. Based on <br />the observations in the field, it was determined that, at this point, no remedial <br />measures are required on the ground. We will wait until spring and see what, if any, <br />growth occurs and determine at that point if any additional measures need to be <br />taken. The operator is aware of the possibility of cheatgrass infestation and has been <br />advised to keep a close eye on the area as the next growing season approaches. <br />The Division has requested a report regarding this event, including pictures, a map <br />and what measures have been implemented to ensure this does not happen again. <br />The Division is requesting this report by the end of November 2005. <br />Overall, the operations and reclamation at the Colowyo Mine are being conducted <br />in accordance with the approved plans contained within the PAP. The operation is <br />doing a good job ensuring compliance with all of the Rules. <br />