Laserfiche WebLink
<br /> <br />IV. Problems, Recommendations and ComDllance Dates <br />The operator is advl5ed that the following problems have been identified <br />during inspections and that failure to correct the problems may result in <br />the Division taking an ENFORCEMENT ACTION pursuant to CRS 1973, as <br />amended, 34-33-123. (Recommendations and compliance dates are to be <br />clearly noted. Oates are to be specific, e.g., January 31. 1983 and <br />underlined.) <br />New Problems <br />034-84-02 Seal the perforations 1n the piezometers at the mine Site both <br />above ground and a minimum of 12 Inches below ground level by <br />April 1~ 1984. <br />034-84-03 Install a new surface water monitoring station on Williams <br />Creek by Nav 7, 1984. <br />Resolution 1n Progress <br />034-84-01 Complete interim reclamation at the waste dl5posal area by <br />April 15. 1984. <br />