Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task #: 004 <br />Date : 09/07/2006 <br />User: RMW <br />State :Colorado <br />County :Grand <br />Site :Thompson Resouroes <br />Agency or organization name :Division Of Reclamation, Mining And Safety <br />Permit or other job action :Bond Recalculation /rom Inspection <br />Task description : Rlp Plt Floor <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Series lI - 8SU (200; Horsepower : 310 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 :3-shank ripper <br />Selected estimating method : Area <br />Altemate methods - <br />Selsmlc : NA NA Load factor : NA Bank volume : NA BCY <br />Area : 20.00 acres Rip depth (ft) : 0.50 Volume : 16,133 BCY or CCY <br /> <br />Source of estimated quantity :Inspection <br />Source of estimated load factor : NA <br />>. <br /> <br />HOURLY PRODUCTION <br />>. <br />: <br />Altemate methods - Job Condition Correction Factors - <br />Selsmic : Seismic velocity : NA feeUsecond Unadjusted production <br />Unadjusted production : NA cu. yds./hour per selected method : 663.09 cu. yds./hour <br /> <br />Area : Avg. ripping depth : 0.50 feetpass Site altitude : 8,010 feet <br />Average ripping width : 7.08 feeUpass Altitude adjustment : 1.00 (Cat HB) <br />Average ripping length : 500.00 feeUpass Job efficiency factor : 0.83 (1 shiR/day) <br />Average dozer speed : 88.00 feeUminute Net job correction : 0.83 multiplier <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.822 acres/hour Adjusted unit production : 550.37 cu. yds./hour <br />Unadjusted production : 663.09 cu. yds./hour Adjusted fleet production : 550.37 cu. yds./hour <br />JOB TIME AND COST <br />Fleet size : 1 dozers) Total job time : 29.31 hours <br />Unit cost : $0.312 per cu. yd. Total job cost : ;5,031 <br />Permi~ob # : M-1983-102 <br />Abbreviation :none <br />Filename : M102-004 <br />