Laserfiche WebLink
CIRCES Coat Estlmatlna Software <br /> Agency or organization name : Divismn Of Redamafion, Mining And Salety <br />Task#: 003 State :CObrado Pertnivob#:M-1983.102 <br />Date: O9r11f2008 County :Grand Abbreviation :none <br />User : RMW Site : Tlpmpson Resources Flename : M102-00.3 <br />Total unit cosOhour E74.83 Total Beet cosUhour. SM8•SB <br />MATERIAL QUANTITIES ~ ~• ~ ~ ~~~~ •~ <br />Initial Swell Loose <br />volume: 12,550 LCY factor NA volume: 12,550 LCY <br />Source o/ quantity takeo8: lnspeceon <br />Source of estimated svrell factor : NA <br />Matedal purchase cost: Ef500 /LCY Total cost: j188,250 <br />Rated payload : 35,400 pounds <br />Payload capaGty: 22.12 LCV <br />Truck CvGe Time <br />5.00 mile haul fdp at: 45.0 mph (avg.)= <br />5.00 mile return tdp at: 45.0 mph (avg.)= <br />Job Condition Correction Factors <br />Average site altitude : 7,850 feet <br />Altltude adjustment /attar: 0.97 p <br />Job efeciency factor: 0.83 (1 <br />Net job cortection : 0.81 <br />Adjusted volume : 11.00 LCY <br /> <br />Exchange time (min.) <br />: 0.50 Source <br />(Cat HB) <br />Load tlme (min.) <br />Haultime (min.) : 2.02 <br />: 8.87 (Cat HB) <br />(rrxlmph)xB0 <br />Dump tlme (min.) : 0.90 (Caf HBJ <br />Retum time (min.) : 8.87 (milmph)x80 <br />Total tyGe time: 18.78 minutes <br />usted HoudV Truck Producton ; <br />Unadjusted unit production: 39.38 LCY/Hour <br />Ad}usted unit production : 31.71 LCYMOUr <br />Adjusted fleet production : 190.25 LCY/Hour <br />Fleet size: B Truck(s) Tofaljob erne: 85.97 Houre <br />Unit cost: E17380 ILCY Total job cost: j217,886 <br />