Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 002 State :Colorado PenniUjob# : M-1983-102 <br />Date : 09/07/2006 <br />User : RMW <br />County :Grand <br />Agency or organization name : DRMS <br />Site :Thompson Resources <br />Abbreviation :none <br />Filename :M102-002 <br />Permit ar other job actipn :Bond Recalculation From <br />Task description : Regrade 1200' of Hlghwall to 3:1 <br />HOURLY EQUIPMENT COST <br />Basic machine : Caf D8R Series 11 - 8SU (200: Horsepower : 310 <br />Blade type :Semi-Universal <br />Attachment no. t :BOPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $58.24 NA <br />Operating costlhour : $73.75 100 <br />Ripper op.cosUhpur : $1.71 25 <br />Operator costlhour : $32.78 NA <br />Total unit cosUhour : $166.49 Total fleet cosUhour : 5168.49 <br />,. <br /> <br />MATERIAL QUANTITIES <br />..: <br />.: <br />Initial Swell Loose <br />volume : 27,000 BCY factor : 1.124 volume : 30,337 LCY <br />Source of estimated volume <br />Source of estimated swell factor :Cat HB <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 150 feet <br />Unadjusted howdy production : 634.3 LCY/hr <br />Matedal consistency description <br />Compacted fill or embankment <br />Average push gradient : 15.00 <br />Average site altitude : 8,020 feet <br />Material weight : 2,900 Ibs/LCY <br />Weight descdption <br />Sand and gravel - D <br />JOB TIME AND COST <br />Operator skill <br />Material consistency <br />Dozing method : <br />Visibility <br />Job efficiency <br />Spoil pile <br />Push gradient <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />Adjusted unit production <br />Adjusted fleet production <br />0.75 <br />0.90 <br />1.20 <br />1.00 <br />0.83 <br />1.00 <br />1.33 <br />f.00 <br />0.79 <br />449.34 <br />LCY/hr <br />LCYlhr <br />449.34 <br />Fleet size : 1 Dozers) Total job time : 87.51 Hours <br />Unit cost : $0.371 (LCY Total job cost : ;11,240 <br />