My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC25973
DRMS
>
Back File Migration
>
Inspection
>
INSPEC25973
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:25:29 PM
Creation date
11/18/2007 10:02:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983102
IBM Index Class Name
Inspection
Doc Date
9/19/2006
Doc Name
Inspection report
From
DRMS
To
Thompson Properties
Inspection Date
9/5/2006
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />SCRAPER . f]w v wnorr <br />.......... <br />PROJECT IDENTIFICATION <br />Agency or organizatlon name :Division Of Reclama8on, Mining And Safety <br />Task # : 005 State :Colorado PermiUob # :M-1983-102 <br />Date : 09/07/2006 County :Grand Abbreviatlon :none <br />User : RMW Site ;Thompson Resources Filename : M102-005 <br />Permit or other job actlon : t3ond RecalcWation From Inspection <br />Task descriptlon :Spreading Topsoil ver 23 Acres <br />HOURLY EQUIPMENT COST <br />Model :Cat 623G Shift basis : 1 per day <br /> <br />Cost Breakdown • Job u81iza8on % Horse <br />power <br />: 365 <br />Ownership oost/hour: $67.15 NA Weight (UST) : q0. g2 <br />OperaBng cosUhour : $91.22 100 Cost data source : (CRG) <br />Operator cosf/hour: $2q.g5 NA <br />Total unit costmour : $183.32 Total Fleet cost/hour : 5183.32 <br />MATERIAL QUANTITIES ~ ~- ~~ <br />IniBal Swell <br />Loose <br />volume; 18,550 LCY factor: NA volume: 18,550 LCY <br />Source of quantity takeoff :Inspection <br />Source of es8mated swell factor : NA <br />HOURLY pRO UCTION ~ ~ ~ ~~ ~ ~ ~ ~- <br />Haulina Caoadty <br />Basis <br />Matedal weight; 1,600 pounds/LCY <br />Material tlescdp8on <br />Top Soil <br />Rated payload : 55,000 pounds <br />Payload cepadty : 34.38 LCY <br />Bowl (volume) Basis <br />SWCk volume: 18.00 LCY <br />Heaped volume : 23.00 LCY <br />Average volume : 20.50 LCY <br />Adjusted capadty : 20.50 LCY "' <br />Cycle Time rload + haul + spread + retum~ Loading 8me : 0.90 minutes ' <br /> <br />Travel 8me : Maneuver and spreading 8me : 0.70 minutes <br /> • loaeirg time cer pair on push-pun models <br />Route Distance (feet) Grade (%) Roll. res.(%) Total res.(%) Velod <br />ty (fpm) <br />Travel time (min.) <br />Haul : <br />Retum: SOg 3.0 5.0 8.0 822 0.65 minutes" <br />500 -30 5.0 <br />"travel time adlastad tar acceleration and deceleration at loatl and dump pools Z.0 2,688 0.19 minutes" <br />vNadnea ara nag. ettalnable per total resistance shorn, not average Total c de time <br />Y <br />2.43 <br />minutes <br />Job Conditlon Correctlon Fartors <br />Site altltude (feet) : 8,010 A~gted Hourlv Productlon <br />Alfitude adjustment factor : 1.00 (Cat HB) Unadjusted unit production : 505.44 LCY/Hour"' <br />Job effidency factor : 0.83 (1 shi/t/day) Atljusted unit produdion : 419 <br />51 LCY/H <br /> . our <br /> Adjusted fleet producton : 419.51 LCYMour <br />Net job correctlon factor : 0.83 -• z urtas vdume °n push-pull modNa <br />JOB TIME AND COST ~ - ~ ~- <br />Fleetsize : 1 Scraper(s) Total job time : 44.22 Hours <br />Umt cost : $0.437 /LCY Togl job cost : 58,108 <br />
The URL can be used to link to this page
Your browser does not support the video tag.