Laserfiche WebLink
The refuse well had been removed since the site was last inspected and the area around the <br />former well seeded and mulched. The operator should submit a well abandonment report for <br />this well prior to final approval of Surety Release #5 (SL-OS) The operator had also <br />extended the pipe into the pond at the location of the spring under the refuse pile. <br />,, .. <br />,: . <br />... ~ . - - <br />~- ,_ <br />-~. <br />-~ - ~ .' <~ <br />e f ~ <br />G`Jw°h <br />~ _ ~ K .,- <br />-~! d y-. v v ~f <br />Y. ., •, <br />k'Fi 1?wt ~:!~ .Y' l ~ffjjr J.e 7'~a ~. Jet.! ,'~~ <br />Final modifications to the permanent impoundment appeared complete as per the approved <br />plan, The emergency spillway was found shaped and a layer of 2-3 inch rock had been <br />added to the spillway channel. The bottom width was approximately 10 feet wide and <br />spillway side slopes appeared about 3H:1 V The principle spillway pipe elevation has been <br />raised about three feet. Seeding and mulchmcl ..^f the area was complete <br />~- •.~- <br />t ;- <br />-- I ,, <br />1 :.'. <br />yi'~~+'Sr' ~ e <br />«' ~ <br />. ~ _ ,~ <br />.:ill Y~il ~, i4 .~ brb .SCE ~f~ ;~a~~+,l i,~l] yi.\i+~l <br />Emergency spillway complete Primary spillway elevator ricr~ :,s~,1, <br />