Laserfiche WebLink
EFCI also completed the cleaning and reshaping of a portion of the clean water diversion <br />ditch below the pond along the fence. as shown in the photograph below. <br />;tom ^~` _'`'~~+`~ia.~, t <br />_,.., :r <br />~,. '.'.:r x:14..' _:.`. . <br />All reclamation work required in the September 21 bond release inspection is now inspected <br />and appears complete. Completion of a well abandonment report for the refuse well and an <br />engineer's certification of the impoundment modifications remain to be submitted to the <br />Division at this time. Please submit these documents as soon as possible, as they are <br />necessary prior to a proposed decision by the Division. <br />Recent disturbances associated with ditch reclamation were observed reseeded and <br />mulched over the entire site. <br />