Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 001 <br />Date : 08?!3/2007 <br />User : BMK <br />Agency or organization name : DRMS <br />Permit or other job action : STET INSPECTION <br />Task description : CUT SLOPES TO 3:1 <br />_ .: <br />HOURLY EQUIPMENT COST <br /> Basic machine :Cat D8R Sedes II - 8SU (200; Horsepower : 310 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 : i-shank dpper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $58.86 NA <br /> Operating wsUhour : $73.75 100 <br /> Ripper op.cosUhour : $3.83 45 <br /> Operator cosUhour : $32.78 NA <br /> Total unit cosUhour : $169.22 Total fleet cosUhour : x189.22 <br /> <br /> <br />MATERIAL QUANTITIES ;. .:: , <br />_.. <br />_. <br />Initial Swell Loose <br />volume : 34, 765 BCY factor : 1.250 volume : 43,458 LCY <br />Source of estimated volume :F,CHIBIT L <br />Source of estimated swell factor :EXHIBIT L <br />HOURLY PRODUCTION Job Condition Correction Factors Soume <br />Average push distance : 250 feet <br />Unadjusted howdy production : 377.8 LCY/hr <br />Material consistency description <br />Compacted 811 or embankment <br />Average push gradient : 1.00 % (i <br />Average site altitude : 5,200 feet <br />Material weight : 2,550 Ibs/LCY <br />Weight description <br />Earth -Dry packed <br />State :Colorado <br />County :Pueblo <br />Site :Evans Pit <br />Operator skill : 0.75 <br />Material consistency : 0.90 <br />Dozing method : 1.20 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.02 <br />Attitude : 1.00 <br />Material weight : 0.90 <br />Blade type : 1.00 <br />Net correction : 0.50 <br />Adjusted unit production : 187.37 LCY/hr <br />Adjusted fleet production : 187.37 LCY/hr <br />Total job time : 231.92 Hours <br />Total job cost : x39,245 <br />PenniUjob# : hF200-041 <br />Abbreviation :none <br />Filename : M041-001 <br />