Laserfiche WebLink
CIRCES Cost Estimatinst Software <br />Date : 03-Aug-2007 Permitorjob no. <br />User : BMiY Abbreviation <br />Filename <br />M-1000.041 Site :Evans Pit #2 <br />none <br />M041-000 <br />State :Colorado <br />County :Pueblo <br />Agency or organization name : DRMS <br />Permit or lob action :SITE INSPECTION <br />TASK Li571DiREGT G05T5) FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />001 -CUT SLOPES TO 3;1 dozer 1 231.0 $39,245 <br />002 -APPLY 61NCHES OF TOP SOIL dozer 1 430.0 $72, 733 <br />003 -REVEGE80ACRES ravage 1 210.0 $63,798 <br />004 -MO$/DEMOB mobilize 1 10.0 $870 <br />includes inflation factor adjustment of <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - <br />NA <br />Liability insurance <br />Performance frond <br />Job superintendent <br />Profit <br />SUBTOTALS :~ 881.0 <br />% TOTAL DIRECT COST' <br />2.02 %ofdlrect total= $3,568 <br />1.05 % of direct total = $1,855 <br />total = <br />10.00 % of direct total = $17,884 <br /> TOTAL o a P = $23, 087 <br />LEGAL-ENGINEERING-PROJECT MANAGEMENT- CONTRACT AMOUNT (direct+08P)= $199,731 <br />Financial warranty processing (legal/related costs) : 500.00 total $ NA total = $500 <br />Engineering work and/or contract/bid preparation ; 8.00 % of colt. NA total = $15,979 <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $9,987 <br />CONTINGENCY- NA' NA total= NA <br />•con7npanclea accounted rot of task level TOTAL INDIRECT COST= $49,352 <br />TOTAL BOND AMOUNT (direct + indirect) _ $128,f98 <br />