My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC22672
DRMS
>
Back File Migration
>
Inspection
>
INSPEC22672
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:22:46 PM
Creation date
11/18/2007 9:45:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000041
IBM Index Class Name
Inspection
Doc Date
8/6/2007
Doc Name
Inspection Report
From
DRMS
To
Fremont Paving & Redimix
Inspection Date
7/25/2007
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatinst Software <br />PROJECT IDENTIFICATION <br />Task #: 002 <br />Date : 0810312007 <br />User : BMK <br />State :Colorado Permit/job# :M-2000-041 <br />County :Pueblo Abbreviation :none <br />Site :Evans Pit #2 Filename :M041-002 <br />Agency or organization name : DRMS <br />Permit or other job action :SITE INSPECTION <br />Task description :apply 61nChes Of <br />HOURLY EQUIPMENT COST <br />soil over BO acres <br />Basic machine :Cat D8R Series II - 8SU (200; Horsepower : 310 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :1-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $58.86 NA <br />Operating cost/hour: $73.75 100 <br />Ripper op. cosUhour: $3.40 40 <br />Operator cosUhour: $32.78 NA <br />Total unit cosUhour : $168.79 Total fleet cosUhour : $188.79 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume ; 64,593 HCY factor : 1.250 volume : 80,741 LCY <br />Source of estimated volume :EXHIBIT E <br />Source of estimated swell factor :EXHIBIT E <br />Average push distance : 250 feet <br />Unadjusted howdy production : 377.8 LCY/hr <br />Material consistency description <br />Compacted NIl or embankment <br />Average push gradient : 1.00 % (r <br />Average site altitude : 5,600 feet <br />Material weight : 2,550 Ibs/LCY <br />Weight description <br />Faith - I]rv narkaN <br />Operator skill <br />Material consistency <br />Dozing method <br />visibility <br />Job efficiency <br />Spoil pile <br />Push gradient <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />Adjusted unit production <br />Adjusted Fleet production <br />0.75 <br />0.90 <br />1.20 <br />1.00 <br />0.83 <br />0.80 <br />1.02 <br />1.00 <br />1.00 ~ <br />0.50 <br />Source <br />18737 LCY/hr <br />187.37 LCY/hr <br />JOB TIME AND COST <br />Fleet Size : 1 Dozers) Total job time : 430.91 Hours <br />Unit cost : $0.901 /LCY Total job cost : 27$733 <br />
The URL can be used to link to this page
Your browser does not support the video tag.