My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC22634
DRMS
>
Back File Migration
>
Inspection
>
INSPEC22634
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:22:44 PM
Creation date
11/18/2007 9:45:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994117
IBM Index Class Name
Inspection
Doc Date
9/25/1997
Doc Name
TENTATIVE ITEM 5 SEPT BOARD 1997 GOLD HILL MILL PN M-94-117
From
DMG
To
MLB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1K <br />23 Jan. '96 MLRD (A. Sorenson) latipection Report of tailings pond liner weld repairs completed <br />between 12/4!95 and I?/29!95 shows repairs are unacceptable, based on testing <br />conducted by Colo. Lining Co. on 1! 16196. Colo. Lining had been hired by COM, lnc. <br />subsequent to Colo. lining's inspection to complete and certify proper repaits. <br />Inspection of the Hazel A showed freeze-up problems with the barrier leakage sump <br />pumping system. Recommended that a tank heater be installed in the sump (this has <br />never been done). <br />23 Jan. '96 Friends of Eldora Valley (FOEV) submits a letter to the MLIiB detailing their concerns <br />about the MLRB's /candling of the Gold Hill Mill situation, on the gxonnds that the <br />MLItB's chronic indulgence of COM, lnc's noncompliance sets a precedent <br />adverse to Eldora's interests regarding the Mogul Tuttne[ operation. <br />25 tan. '96 MLRB holds monthly update hearing for COM, lnc, at which FOEV letter (above) is <br />presented. COME (R. Masan) otters testimony relating to lack of effective overall <br />engineering oversight leading ro faihcres at Hart/ A edit and tailings pond liner problems; <br />we conclude with a recommeadauon that the Board should follow previous Staff <br />recommendations to set a permit hearing for revocation and site reclamation, aad <br />continue momhiy status updates as long as required m assure on-the-ground stability of <br />the site. <br />Note: A9 of 3 Sept. '97, nothing has chatlged, ocher than an improvement in COM, lnc. <br />employee civility. <br />2:i Jan. '96 Ml-RI) Staff makes presentation to the MLRB recommending modification of the C8tD0 <br />(see above) to specify a Eeb. 16, 1996 deadline for completion of the corrective action <br />(liner repairs & necessary verifications}, end the imposition of a $13,000 civil penalty <br />(SZOO/day for 65 days), or continuance of consideration of civil penalty until the <br />February meeting. <br />25 Jan. '96 COM, inc. submits its monthly report ro the MLRB, b:it offers no rebuttal to COME <br />observations on the mgineeriag situation. Their report sates water-balance problems, <br />which could become severe under conditions similar to those encountered last <br />Sprmg. due W the infihration of water into the Hazel A edit. The report claims <br />storage capacity is the tailings pond aqua] to 16676 of a 100-year, 24 hoar event, <br />assuming fro decant to the Hazel A (and no pumpinglr'am the Hazel A). They <br />promise rapid development of a plea to remove the Hazel A from the overall <br />milling system. <br /> <br />25 tan. '96 MLRB issues a Board Order continuing the hearing to consider assessment of civil <br />peaaldes to the February 21 - 22, 1996 meeting and setting a hearing to consider <br />revocation of COM, lnc's milling permit during the March 27 - 28, 1996 mating; <br />the order further continues the monthly status reporting pending fu[ther Board direction. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.