Laserfiche WebLink
~ ~ • (Page 9) <br />MINE ID # OR I~RC`SP)~GTSNG ID # M-82-131 <br />INSPECTION DATE '3/8/2001 INSPECTOR'S INITIALS TAS <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective <br />actions) were ident~].fied during this inspection. The problems should be corrected by the <br />dates given, or they will become possible violations. The possible violations should be <br />corrected by Che dates given to reduce their severity when considered by the Mined Land <br />Reclamation Board., The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />1. There were no signs or markers posted as required by <br />Rule 3.1.12. <br />CORRECTIVE ACTIOb(S <br />Post an entrance sign and mark the germit boundaries <br />for Areas A ~ B in conformance with the requirements <br />of Rule 3.1.12 apd submit photographic evidence of <br />completion Of these tasks. <br />2. The operator has begun dewatering activities at the <br />Amendment Area A and there .is no evidence of compliance <br />with permitting Tequirement:; of the Office of the State <br />Engineer (OSE). A condition of the Board approval for <br />the permit is that the operator will not expose groundwater <br />until the appropriate permits are obtained from the OSE. <br />CORRECTIVE 1'C~'IODtiS <br />Provide a written statement from the OSE verifying whether <br />the current activities at tl~e Bucklen Pit (Areas A ~ B) are <br />or are not in compliance with all permitting requirements <br />of the OSE aad the necessary permits have or have not yet <br />been secured. <br />3. The operator has not submitted monthly and quarterly <br />groundwater monitoring data as indicated in the August, <br />1995 Monitoring Well Program. <br />CORRECTIVE ACTIOtiS <br />Submit all available groundwater monitoring data that has <br />been collected as specified in the August, 1995 Monitoring <br />Well Program, submit evidence of a resumed groundwater <br />monitoring program for all x~ells specified in the monitoring <br />program, and submit an application for a technical revision <br />to incorporate the groundwater monitoring program into the <br />mining and reclamation plan. <br />CORRECTION <br />DATE <br />April 20, 2001 <br />PB or PV PB <br />TOPIC(S) : SM <br />April 20, 2001 <br />PB or PV PB <br />TOPIC(S) MP,HH,ST <br />April 20, 2001 <br />PB or PV PB <br />TOPIC(S) HB <br />