Laserfiche WebLink
<br />(Page 5) <br />MINE ID # ORiP~tO~~SPF~R(~NC1 ID # M-82-131 <br />INSPECTION DATE 3/6:/2001 <br />9. The existing $68,984 reclamation bond will be inadequate to <br />complete the reclamation plan when Area A is completely <br />disturbed. The Division estimates that a reclamation cost <br />and financial warranty of $80,000 will be required at that <br />time. (The operator is currently bonded for mining all slopes <br />in the Amendment Area A at a 3:1 slope. <br />coxnECTxvB 1-c~xoNs <br />Submit on or before April 20, 2001 a written clarification <br />of whether future excavation at Area A will occur at slopes <br />no steeper than ~:1 or whether future mining will occur at <br />slopes steeper t an 3:1. In the event that future mining <br />will occur at slopes steeper than 3:1, then the Division <br />requests that the operator provide on or before May 22, 200'_ <br />a properly execu~~ed replacement warranty of $80,000 or a <br />supplemental warranty of $11,016. <br />INSPECTOR'S INITIALS TAS <br />April 20, 2001 <br />May 22, 2001 <br />PB or PV PB <br />TOPIC(S) FN <br /> <br />