Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made during the <br />inspection. Comments also describe any enforcement actions taken during the inspection and the facts or <br />evidence supporting the enforcement action. <br />backfilled and re-graded azea appeazs stable with no significant erosion noted at the time of this <br />inspection. <br />Topsoil redistribution, and seeding remains to be completed at the 2001-2002 area. Some topsoil <br />redistribution was initiated in the fall of 2003. The abatement deadline for CO-2003-012 was <br />fixed at January 19, 2004. Due to climatic conditions precluding abatement within 90 days, the <br />time for abatement was extended to April 18, 2004. <br />