Laserfiche WebLink
The ditch on the northwest side of the un- <br />mined center core of the mountain has been <br />cleaned and repaired since the last <br />inspection. (see photo at left) The operator <br />has also modified the drainage above pond <br />8 using a downdrain to direct runoff to the <br />pond east of Fill 8. <br />The perimeter ditch between pond 8 and <br />pond 9 also requires some cleanout due to <br />deposited sediment to ensure proper flow in <br />this ditch, Riprap in the steep section of <br />ditch leading to pond 9. immediately below <br />the Jeff Canyon haul road also regwres <br />some reshaping due to movement. Side <br />cutting in this ditch should be eliminated with some modest reshaping of this portion of ditch. <br />