Laserfiche WebLink
ado Division of Ninerals and 6eologY <br />ESTIHATIHG FORM - NHEEL LOADER WORT <br />----------------------------------- <br />~eet 1 of 2 <br />Task 1: 4 Prep. by: SSS Task filename : N148-4 <br />Date : 02/21/95 Permit I:N-86-148 Mine: Weaselskin <br />Pertitting action :General 110121 type permit bond recalculation <br />Task description Replace and regrade topsoil over affected areas ~i <br />HOURLY EAUIPMENT COST <br />-----=-=-=-=------=-= Basir varhine: CAT 980C Horsepower = 210 <br />Attacheent Il: ROPS Cab Shift. basisa/day <br />(D91 hke) <br />Cost Breakdown - Uwnership = 541.11 <br />""""""" - Operating loader = 532.03 100 X utilization <br />- Operator = 521.58 <br />- total cost/hr - 594:78 Total fleet costJhr = S94 18 ~ <br />HATER[AL AUANTITIES <br />Initial Swell Final <br />volute = ,,,11,777,3 LCY factor = H(A.` , volute = II,777.3 LCY <br />9uantity source/reference : Assure 7.3 acres ? lac.ft./ac. <br />............................»........,..,..,......, i <br />Y Swell source/reference : NA_....",,,,,,,,,,,,,,,,, ,,,,,*".,,, ........". I <br />HOURLY-PRODUCTION <br />Loader Cycle Tiee <br />Unadjusted Basir Cycle Tiee (load, duep 6 taneuver) = 0.550 tin. <br />(CHB mk') <br />Cycle Tite Factors: Factor (tin.) <br />Naterial- Naterial 1/8' to 3/4' diaeeter -0. 020 (CHB eda) <br />Pile- Conveyor or doTer piled 10 ft. high or 0. 010 (CHB eda) <br />Truck Ownership- No adjustment - factor riot applicable 0. 000 ICHB eda) <br />Operation- Cor~stant operation -0. 040 ICHB eda) <br />Target- USER-PROVIDED TARGET EACTOR <br />...................................... 0. 100 (USER flw) <br />Net CYCIe Time Adj.= -0.050 ein. <br />AdJ. Basir Cycle lime = 0.500 ein. <br />